Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work, however, the Contractor may be required to build or set sleeves, - inserts, chases or <br />other components of the Work needed for mechanical, plumbing, electrical or other work by <br />other contractors. <br />7.33 The Contractor shall be responsible for permanently fixed service facilities and systems in <br />use during progress of the Work and shall. strictly adhere to the following procedures: <br />a) 'Prior to acceptance of the'Work by the Owner, the Contractor shall remove and <br />replace any part of the permanent building systems damaged through use during <br />construction. <br />b) Temporary filters shall be installed in each of the heating and air conditioning units, <br />return air grilles, and other locations to prevent intrusion of dust, dirt, and debris <br />during construction. Temporary filters shall be removed 'and replaced with new <br />filters immediately prior to Substantial Completion. <br />C) Extra effort shall be maintained "to keep the building clean and under no <br />circumstances shall air systems be operated if finishing operations are creating <br />dust in excess of what would be considered normal if the building were occupied. <br />d) When the permanent lighting system is*used during- construction, lamps shall be <br />replaced and shall be new on the date of. Substantial Completion. <br />ARTICLE 8. OWNER <br />8.1 The Owner shall issue communications and notices to the Contractor thrg'ygh the CIVIAR to <br />the extent contemplated by the Contract Documents. <br />8.2 In case of termination of the employment of the Designer, the Owner shall appoint as <br />Designer a qualified person who shall have and'assum.e all rights and duties held by the <br />original Designer. <br />8.3 The Owner shall have the right to take possess'16 n of and use any portion of the Work <br />notwithstanding the fact that the time for.completion of such portion of the Work may not <br />have expired, but such taking possession and use shall not be deemed an acceptance of <br />any Work not completed in accordance with the Contract Documents. <br />8.4 A waiver an the part of the Owner of any breach of any part of the Agreement by the <br />Contractor shall not be held to be a waiver of any other or subsequent breach. <br />8.5 The Owner shall pay all permanent acreage fees, governmental impact fees, and meter <br />deposits for permanent utilities. <br />ARTICLE 9. . CONSTRUCTION MANAGER <br />9.1 The Owner has engaged the CMAR for the purpose of (I) 'assisting the Owner and <br />Designer in developing and administering budgets and cost:bontrols, (H) in evaluating <br />constructability and value engineering proposals, (ii!) in establishing and maintaining a <br />critical path method (CPM) schedule, (iv) in coordinating and/or 'expediting all Work on the <br />Project,. (v) in coordinating all Work on the Project with other projects being constructed by <br />the Owner or others adjacent to or near the Work, .and .(vi) for such other purposes as the <br />Owner may deem appropriate. <br />GENERAL CONDITIONS FOR CIVIAT RISK PROJECT* 24*6f 42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.