Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br />shall pay all bills for its consumption ofwater, or other public utility service to the <br />Project site. <br />77.26 The Contractor shall indemnify and hod the' M the Owner; the' ' the <br />Designer's consultants, and their respective and employees harmless <br />against all ooa1e, damages, and expenmes, including ottorn , afeeo and 000b* of defense, <br />arising out of claims by any separate contractor or by any Sb <br />---~~''~~~~'' or supplier ^engaged by or e"'por"" by the'Contractor or ='p'"xev by any <br />of the Subcontractors claiming him, including without limitation damages, |onoeo, <br />and expenses nhminQ out oforrelating bo any inconvenience, delay' interfensnoe, or other <br />action. or non-action of the Contractor or the Contractor's Subcontractors on the Project. <br />The Contractor acknowledges that should the Contractor or or oOy of the Contractors <br />Subcontractors be damaged by any breach of contract by any other separate contractor on <br />the Project, the Con �ador may invoke applicable. dispute resolution procedures with said <br />. <br />other separate contractor. <br />. <br />7.27 prio*r to completion of the Work and Final Payment of the Contract Price' excepting only <br />those portions ofthe Work deemed accepted in accordance with the Contract ocuments. <br />the Contractor ehoU have charge and cans of the Work, and shall take every precaution <br />against injury or damage bo any party due tothe'eoUonofthe -e|emeOtuor from any other <br />cause, whether arising from the execution or from the non-execution of the Work. The <br />Contractor shall, as required by the C��AR. rep|aoe, rebui|d, repair, nentona, and make good <br />all injury or damage to any portion of the Work occasioned by any of the above coVeea <br />before Final Completion and shall bear the expenoeothenooL <br />. <br />' 7.28 In event that the Work, or any portion thereof, is suspended at any time pursuant to an <br />order of the Owner, the Contractor shall obey all instructions of the Ck8AR regarding <br />storage of materials, drainage, protection of the Work, and erection of temporary structures <br />during the suspension period. <br />7.29 The. CMAR 'shall be responsible for the coordination ofthe Work of the separate <br />contnautors�, both as to space and time. The CMAR shall incorporate the <br />� <br />Construction Schedule into the Master Schedule and coordinate the implementation of the <br />Contractor's Construction Schedule. The CMAR oho|| also coordinate close-out of the <br />Project, including but not limited to all testing, |napection, uertifioabona, and approvals <br />required by public agencies. <br />The Contractor shall notify the CMAR promptly of any event or condition which could affect <br />the conduct or" progress of the Work and shall Pooperate fully with theCK8/\R and all other <br />separate contractors on the Project site. <br />. <br />7.30 The has delegated to the CK8ARaU of its duties to coordinate 'and to. expedite the <br />\Nurk'not'expresak/ reserved to the Owner bvother provisions of the Contract Documents. <br />7.31 All Work performed pursuant to the Contract Documents shall conform in all respects to the <br />North Carolina State Building Code and all other state, local, and national codes in effect at <br />the time of and applicable to this Work. <br />7.32 The CMAR shall coordinate and supervise the installation of all sleeves, inserts, chases or <br />other components of the Work needed for mechanical, plumbing, electrical or other work by <br />'`ihe various contractors. The responsibility for exact location of such items shall bathat of <br />..the mechanica, plumbing- a|mcthuoi or other prime contractor that requires the item for <br />passage or support of its work. Gonerally, th6mechankca|, plumbing, electrical or other <br />� <br />contractor that requires such items for support or passage of its work shall set its sleeves, <br />Inserts, chases or other devices. If necessary hz maintain the progress ofand.comp|etaits <br />� � <br />BENEF�\LC[]�0[OONGFOFlCK84J'FO8>�PF�OJEC�' 2@of42' � � '� � � JUNE'2OO7EDD]DN <br />`` ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.