Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
barricades, and properly light the area. The Contractor shall comply with any directions and <br />public authorities |nUl�roopacL <br />7.20 The 'Confnaotnr shall- adher*0 to the rules, regulations, and interpretations of the North <br />Carolina — Department of Labor's Occupational Safety and ."e=.u. Sv='w=vs 'for the <br />Construction Industry (29 CFRPod 1926 as adopted in 13 NCAC 07F.0201, including 29 <br />and '`'~'' `~~'^ ~=t. m95-12" through " 155 (Occupational Safety and Health) au well asall. <br />revisions and amendments to such standards or statutes as may occur throughout the <br />performance of the Work. <br />7.21 Any land-disturbing activity performed bv the Contractor |n connection with th oh�( <br />. �mp���aUemo�nc��o meoeu�sset ����e Con�o�Doou0en�` and any <br />additional measures which may be required in' order to ensure that the P 'eot is in full <br />compliance with the Sedimentation Pollution Control Act of 1973' as implemented by Title <br />15 North Carolina Administrative Code, Chapter 4, Sedimentation Control, Subchapters 4A, <br />4B and 4C, as amended (15 NCAC 4A, 413, and 4C), and as may be revised or amended in.' <br />the future. Upon receipt of notice that a land-disturbing ocUvitvioin violation of said Act, the. <br />[�ontrectorehaUbe responsible for onouhng.that oUsteps or' actions necessary to bring the <br />Project |ncompUanoeVvithaaidAotonapnonopUytoken.TheControctorehaUberempVnejb|e <br />U <br />for�pena|tie��ooeeeedpUrnuaDttoN.<�.(Sen.GtaL113/�0���hreopact�oitaVVorh,and <br />shall indemnify and hold harmless the CMAR and the Owner from all costs and'expenses, <br />including attorney's fees and costs of defense, arising out of or related to the enforcement <br />of the Act against any party or person described in this Article. <br />7.22 The Contractor shall designate e responsible officer oremp| * 'ae <br />' <br />inspect r.. <br />whose duties shall include accident prevention on the Project anwell- ae implementation the Contractor's safety measures and safety programs on the Project., The ' nena of the <br />safety inspector shall be made known to the C AR ot the pre-construction oonfenance` <br />7.23 In emergencies affecting the safety of persons.-the Work, or property at the.. '�a�� <br />adjacent the Contractor is obligated to act in the Contractor's discretion to prevent <br />threatened damage, injury, or loss. As soon as practicable, thd Contractor shall <br />notify the <br />C8AR of such emergency. The Contractor shall give thmCKAR�pnomotvrK1an notice of <br />any significant changes in the Work or deviations from the Contract Documents omueedby <br />such ennerQancy. If the Contractor believes that additional work done in* an' emergency <br />entities the Contractor to an increase in the Contract Price or an extension of the Contract <br />Time, the Contractor may make a c|oinn therefore as provided in Art|V\ea 14 and/or .15 of <br />these General Conditions. <br />7.24 Tho �um Contractor at all times accumulation of wesi <br />a <br />materials or rubbish caused by the Work. At kaao1 <br />- at / completion .of'the <br />Work, the Contractor shall remove all waste materials and <br />rubbish' attributable to the <br />Co, ntro�o['s Work from and about the Project. At the completion . th� VVork'- the <br />Contractor ahoU remove all too|a, construction .equipment. machinery, and surplus <br />materials. The Contractor ehe|| leave the Work in condition for occupancy by the Owner <br />such that no cleaning or other operations are required. Material cleared from � the Project <br />and deposited on adjacent property shall not be considered as having been disposed of <br />satisfactorily. If the Contractor falls bo keep the Project deanondfreeofwaetamaterio|eor <br />rubbish, fails to satisfactorily clean-up weekly orai the completion of the Work, the CK&AR <br />' <br />may do so 'and the costs thereof may be deducted from any amounts due or to become <br />due the Contractor. <br />� <br />7.25 Utilities, temporary and signs be'provided as described in, the Contract Documents... Absent a contrary direction in the Suoommentom' .�he ' <br />` ' <br />'..JUNE ` <br />-GENEF�\LCONO[T|[�N@F[�R�(�yW/�FFUS�� PROJECT � 22of42� � � � 2OO7E0[TKJN <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.