Orange County NC Website
to remain in the vicinity of the operations and barricade all. walks, roads, 'and' <br />areas eo necessary to keep the public away from the conetnuoUon. <br />7.17 The Contractor shall provide cover and/or protect all <br />� of the Work and provide all <br />materials necessary to protect the Work whether performed by the Controctor.or any ofthe <br />Subcontractors or sub-subcontractors. Any Work damaged through- the <br />lack of prop eir <br />protection, o� from any other cause, shall be repaired or replaced without extra cost to the <br />CMAR or extension to the Contract Time. <br />' <br />The Contractor shall maintain the Work during construction and until the Work io <br />This maintenance shall constitute continuous and effective effort prosecuted day*by day, <br />with adequate, equipment and forces so that the Work is maintained in satisfactory <br />condition at all times. All costs of maintenance shall be included in the Contract Price and <br />the Contractor will not be paid an additional amount for such effort. Should the CMAR <br />observe that. the Con*trac'tor at any time has failed to maintain the Work as provided herein, <br />the CMAR may immediately notify the Contractor of such non-compliance. Such notification <br />shall specify a reasonable time within which the Contractor shall be required to remedy <br />such unsatisfactory maintenance condition. Should the Contractor fail to property respond <br />to the CMAR's n'otiflcation, 'the CMAR may, at the Contractor's expense, take such action <br />as it may deem appropriate to remedy the defective maintenance, including suspension of <br />the Contractor'§ Work or any part thereof, Any such expense incurred by the CMAR shall <br />be deducted from monies due or to become due the Contractor. <br />Parking lots, streets, and walks connecting to the Project-area' shall at all times be <br />protected by the , sand, . � � . <br />� —_—. <br />Pedestrian traffic* around the construction limits must be maintained in a clean and <br />safe condition at' all Umoa with required barricades and covered When <br />��������o�c���eP��|����u�.� walkways, shall, <br />All ��hm��a�n�d��Um���� <br />u�v�, vicinity of the Project site shall ba protected at <br />all times from entry of dirt, rubble and other debris. The residue from the cleaning of trucks, <br />vvhoo|barrowm, concrete buggies, etc. must be prevented from entahng - the drainage <br />oyotem, and if cleaning is done, the residue must becontained and nannmved from the <br />pndeotmite'with other refuse. <br />7,18 No burning' debris uhd| be allowed inside or around the Project during the <br />course u/construction. <br />7.19 The Contractor *shall 'provide for and maintain <br />programs for the protection of its employees and other persons at the P 'aite.andahoU <br />comply at all times with the requirements of the most current edition of the <br />CAGC <br />Safety <br />and Health. Manual (or the AGC Accident Prevention Manual in Construction], or the <br />equivalent requirements of the Contractor's safety program, and shall fully comply with all Fedora|. State, and local |avm, ru|eo, regulations, and building code requirements so <br />as to <br />prevent accidents or injuries toperoonsonoraboutiheP 'eoto|te. T'heCon�ocbzrehaU <br />clearly mark or t i i � of existing hazards, ' shall <br />.elevator 'Shafts, itairways, floor and wall openings and similar hazards. The Contractor <br />protective devices and s/�'/=u//uv�/mu:tneprogreeeoron�Yvorm. ' <br />' <br />-All trenches, well barricaded, -and properly lighted at night. When Work requires closing of an area normally <br />=�d"x�. the Owner o the public, the Contractor shall furnish, erect, and maintain temporary <br />GENERAL COND0ONS.FOFlCNAt. RISK PROJECT. 21of42 JUNE2OO7` B]|TK3N ` <br />