Orange County NC Website
specified quality, -or take such other uornecUve action oo the CK8AR may d�ect No change <br />in the Contract Price or in Contract Time shall be made as a result of authorizing a change <br />in methods or equipment under this paragraph., <br />7.6 All nnotoria!o and equipment oho| be new, except as otherwise provided in the Contract <br />Documents. When special makes or grades of material which are normally packaged by <br />the supplier or manufacturer are specified or , such materials ahaUbedehvoredto <br />the Project site in their original or containers vv�h seals unbroken and labels <br />Materials shall be so stored as to,assure the preservation of their quantity, quality and <br />fitn * ess for the Work. Stored materials, even though approved before storage, may again be <br />inspected by the CMAR, the Designer or the Owner prior to their use in the Work and shall <br />be required to meet the requirements of the Contract ' Documents at the time they are <br />incorporated into the Work. Stored materials shall be located so,as to facilitate their prompt <br />inspection. The Contractor shall coordinate the storage of all materials with'the CMAR. <br />Materials to be stored at the Project. or on the Owner's property shall not create an <br />notb�uaad� without written consistent with the provisions of <br />paragraph 20.3 of these General Conditions. The Contractor shall make all arrangements <br />and bear all expenses for the storage of materials on private property. Upon r6qubst, the <br />Contractor shall furnish the Cw*mn copy mthe property. owners permission. All storage - <br />sites on private or the Owner's property shall be restored bl their original oondition b«the <br />Contractor at its enfire expense, except as otherwise agreed to (in vvdUng\ by the owner or <br />lessee. of the property. <br />7.7 All .materials and,eq'' ment shall be apo|ied, installed, oonnected, erected, used, cleaned <br />and conditioned ' in accordance with 'the instructions. of the manufacturer, <br />fabricator, or prooaao�� otherwise �Xoeot�a other0� provided in the Contract Documents. <br />. ` ` <br />7]3 The Contractor will be fully responsible for all and omissions of its Subcontractors and <br />of persons directly or indirectly employed by them and of per * onofo[vvhooe act any of <br />them may be liable to the same extent that the Cnn�aohz is responsible for the acts and <br />omissions of the Contractors oVvn'aOlp|oyges` Nothing iO.tha Contract OomJ0eOte shall <br />create any contractual relationship between any Subcontractor or supplier and the CMAR, <br />the Owner orthe Designer,* or any obligation on the part ofthe Ck8AR. the Owner or the <br />Designer to pay oro to the poyrnentof.aoy nn h duo any such Subcontractor or <br />material a| furnioher except as rnayothe�iae be raqV{nad by law. The {�K8AF� may furnish to <br />any Subcontractor or supplier', to* extent practicable, evidence ofamounts paid to the <br />Contractor on account of specific Work done. <br />` <br />� <br />7.9 The divisions and sections of the 'Specifications and the identifications of any Drawings <br />shall not control the Contractor in dividing the Work among Subcontractors. <br />7.10 The Contractor agrees to bind e to the terms and conditions <br />of the Contract Documents for the benefit ofthe CMAR and to furnish written evidence <br />thereof to the CMAR within seven (7) days after written request bv the CMAR. <br />7.11 The Contractor and| attend job progress conferences and oU- other meetings or <br />conferences as directed by the CMAFl. The Contractor shall be represented at these job <br />progress conferences* by.a,representative having the authority of the Project Manager and <br />by such other representatives as'the CMAR may direct. Job progress conferences shall be <br />' <br />open bo Subcontractors, suppliers and any ra who may contribute beneficially toward <br />maintaining naqu|nyd job* -ppogreop..and such personnel ohoU be encouraged by the <br />.'Contractor to attend. It shall be the principal purpose of job progress conferences to effect <br />coprdinaMon, cooperation and assistance in'every practical xvoy bzxvand the ond.of - <br />GENERAL CONDITIONS FOR CK8 .�RI /PR{)JECT� B*of43 � �� JUNE 2OO7EDDFKJN <br />� � � � � <br />