Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` <br />written request ofthe CMAR, be removed forthwith by the Contractor, Subcontractor, or <br />sUb-subcontractor employing such person without cost to the CMAR, and shall not be <br />employed again in any portion of the Work without the prior vvhtteDepprovo|oftheCK8AR. <br />Should the Contnactorfoi|'to nanhove such person or persons or fall to furnish suitable and <br />sufficient personnel for the proper prosecution of the VVod« within three (3) days after <br />written order, the CYWAR may withhold. further payment by mrU±an notice until compliance <br />with such order. <br />7.4 If, in the opinion of the the or the Owner, -any Subcontractor onthe <br />Project is incompetent or otherwise unsatisfactory, such Subcontractor shall be replaced by <br />the Contractor with no |non*asm in the Contract Price if and when directed by the CK8AR in <br />writing. <br />7.5 The Contractor shall furnish all msteho|n. equipment, |abor, transportation, construction <br />equipment and mech|nnry, tools appliances, fucH. light, heat and all other facilities and <br />incidentals necessary for the execution,, maintenance, initial operation, and completion of <br />the VVork, other than those specifically excluded by the Contract Documents and to be <br />furnished by the CW1AR or others. When use or storage of hazardous materials or <br />equipment or methods of more than ordinary risk are necessary in accomplishing the Work, <br />-the Contractor shall give the CK4AFl reasonable advance notice. <br />If any materials ` hotmfurnished � or installed by the CMAR or others under the terms of <br />the Contract Documents, said materials shall be made available to the Contractor at the <br />location(s) specified in -the Contract Documents. All costs of handling, transportation from <br />the specified location to the- Project, storage, and installing of materials furnished by others <br />shall be included in the Contract Price. The Contractor shall be responsible for any <br />demurrage, damage, loss,'or other deficiencies which may occur during the Contractor's <br />handling, storage, or use of material furnished by others. The CMAR shall deduct from any <br />monies due or to become due the Contractor any cost incurred by the CMAR in making <br />good any such damage, loss, or deficiency. <br />All equipment which is proposed to be used in the Work shall, be of sufficient size and in <br />such mechanical condition. as to meet the requirements of the Work and produce o <br />satisfactory. quo|Uxof work. Equipment used on any portion ofthe Work shall be such that <br />no injury to pnaviouolyoomp|etwd VVork, adjacent prbperh/ or existing facilities shall reou|t <br />from its use. <br />When the methods and equipment to be oa � <br />d by Contractor Work <br />ope not prescribed in the Contract Documents, the Contractor shall be'freeto use any <br />methods or equipment that will accomplish the Work in conformity with the requirements of <br />the Contract O000mento, <br />When the Contract Documents specify the use of certain methods and equipment, such <br />methods and equipment shall be used unless others are authorized in writing by the <br />CMAR. If the Contractor -desires to use a method or type of equipment other than that <br />specified in the Contract Documents, the Contractor may request authority from the CMAR <br />to do so. The request shall be in writing and shall include a full description of the methods <br />and equipment proposed and of the reasons for desiring to make the change. If approval is <br />given, it shall be on the condition that the Contractor shall be fully responsible for producing <br />Work in conformity with the requirements of the Contract Documents. If, after trial use of <br />the substituted methods or equipment, the CMAR or the Designer determines that the Work <br />produced does not meet the requirements of the Contract Documents, the Contractor shall <br />discontinue the use of the substitute 'method' or equipment and shall complete the* <br />remaining Work wiffi the specified methods, and equipment at no additional cost to the <br />Owner. The Contractor' shall remove any-.deficient Work and replace it with Work of <br />GENERAL CONDITIONS FOR CMATF���PF�UE�T 18of42 �� � j�NE2OO7B]D]QN <br />� `�� . � ` � <br />
The URL can be used to link to this page
Your browser does not support the video tag.