Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4 of submittals by the CMAR and the Designer shall not be construed as relieving the <br />Contractor from responsibility for compliance with terms or designs of the Contract <br />Documents nor from responsibility for errors of any sort in the submittal. <br />6.5 The Contractor shall. keep one record copy marked all <br />Drawings, Addenda, Modifications, and Submittals at. the Project in - 000d order and <br />annotated at least monthly to show all changes made. during the construction process. <br />Such monthly annotations and their approval by the CMAR shall be a condition precedent <br />to approval by the CyWARof each monthly Request forPa ment.Said'�euondcopyahaUbe <br />stored at the Project and fd|y protected from dam oQe by fire or other hazard. This record <br />copy shall be available to the CK8/\R' the Designer and the Owner for inspection at all <br />times. The complete record copy shall be delivered to the CIVIAR for review and transmittal <br />to the Designer for the Owner's purposes prior to the Designer's certifying Substantial <br />Completion of the Work. <br />6.6 At completion of the Project andbeforeFina'povment, the Contractor shall assemble and <br />deliver tothe CMAR one complete set of all as-built drawings and one complete set ofall <br />approved aubmitta|a, product dota, and bonnp|eo.vvhich were reviewed by the Designer. <br />These drawings and submittals shall be on paper, or in electronic or other media if required <br />by the Supplementary Conditions, These drmvvingm.ond*odbmitto\a shall be categorized <br />and packaged aa directed by the Designer. `' <br />ARTICLE 7. CONTRACTOR <br />� . �� � <br />7.1 The [�ontnaotorshall eupeni000nd�dineot the \A/mrk `ondvviththeContnachor'sbaat <br />sd|| and attention. Except as may be set forth specifically in the Contract Documents, the <br />Contractor shall be solely responsible for the means* methods, techniques, sequences, and <br />procedures of construction, and for safety precautions and programs [n connection with the <br />VVod(. The Contractor shall be responsible to *see that the finished Work complies <br />accurately with the Contract Documents. <br />7.2 The Contractor shall appoint a'competent with to <br />manage the Project for theContractor.TheContractoralsoohal|keepon'thePmect at all <br />times during the VVodx of the Contrnptor a -competent Resident' Superintendent and <br />necessary assistants who shall not be replaced without prior written approval by the CYWAR <br />exoeptuOdm7extraordiDarynincUmatancee,invvhicheventinn0ed|etawrittennotimaoha|\be <br />' <br />given to the [}W1AR.-|f approved by the C|K8AR' taking-into account the scope and <br />comp|exity of the Work of the Contractor, the Project Manager and the Resident <br />Supefintendent may be the same person. *At any time, the CMAR, in its sole and absolute <br />discretion, may require the Contnactor - to ?apiace the Project Manager or Resident <br />Superintendent with an experienced and competent persbn,or persons upon -seven (7) <br />days written notice from the CYWARhothe Contractor. -Such replacement ent oha\| be at the <br />Contractor's expena�andmtnocoattoUlmCNAR. <br />' <br />Both the Project Manager and the Resident Superintendent shall have authority to act on <br />behalf of the Contractor, and instructions, directions or notices given to either of them shall <br />beao binding oeif given to the Conboctor. <br />. <br />7.3 The Contractor shall provide sufficient competent and suitably 'qualified pmraonne|, <br />equ(pnuent and supplies to lay out the Work and perform construction as required by the <br />Contract Documents. The Contractor will at all times -maintain good discipline -and order at <br />the site, and will comply with all applicable OGH/4'stondarda� <br />Any 'person enno|oved,bv the Contractor, bv`ony/.Subuontroubor, or by any sub- <br />subcontractor who, �|n �e.opin�n � �m CM� �m Designer � �a ��, does n� <br />pe�orrnDeVVorkin� proper and skillful manner oriainhsmperabe*or disorderly shall, etthe <br />. � � <br />GENEF6uLC[]0D[T\ONSF[�F�CK8/g�FB8P{PF�OJECT .17of��` � ���� � ���� JUNE 2OOTED[T\[]N <br />` ' � ^ ^ <br />
The URL can be used to link to this page
Your browser does not support the video tag.