Orange County NC Website
environmental hazards, and make such changes. in the' Drawings and/or Specifications .ai <br />they may find necessary to abate, �emed|ate, isolate prhandle the environmental hazards. <br />Any increase or decrease in the Contract Price or the.Contneut Time resulting from such <br />changes shall be adjusted in the manner provided herein for adjustments as tm extra and/or <br />additional Work and changes. |tia agreed that the Contractor shall. have no liability under <br />this Agreement for any. environmental hazards existing ot , on or in th Png' ect site prior to <br />the *date that Work commences under this Agreement- unless the e-Controotor or. its <br />8ubcontnactoro, agents or employees, acting alone or in concert with others,' by their own <br />negligence or misconduct, na|eooe' or expose the Owner. or third parties to the <br />environmental hazards. <br />The provisions ofthis paragraph 5�.*shalisurvive the termination m cancellation or <br />completion of this Agreement. <br />ARTICLE 6. OTHER RECORD DOCUMENTS AND SUBMITTALS <br />. <br />6.1 The CK8AR shall furnish to the Contractor the numb`r and <br />Specifications stated-in the Supplementary Conditions. Additional copies of Drawings and <br />Specifications may be obtained at the cost of reproduction and hand|�� <br />. <br />62 The Contractor shall submit to the CMAR for forwarding to the'[eaigOe[ all Submittals <br />required by the C ooUinenta. The Contractor shall submit four (4) reproducible <br />prints of all shop drawings plus the number of copies sufficient for its requirements. The <br />Contractor shall submit samples in quantities required by the Contract Documents. The <br />' <br />'Contractor shall submit product data in five (5) copies, plus the number of copies sufficient <br />for the Contractor's naquin»rnanta. All shop drawings shall be reviewed by the Contractor <br />and sfiali bear the Contractor's stamp of approval before being forwarded to the CMAR and <br />the Designer. Submittals shall be submitted in such time as to cause no delay to the Work <br />' or aOy'portthmreof and in accordance with the Contractor's Construction Schedule and <br />8Ub0�ba| Register.* The *(�K8ARahoU [ev|*�vaDd process the aVbmd±a| with reasonable <br />promptness, noting desired corrections, 'if any. ThaCKAAR oheU retain three (3) copies of <br />the oVbnOitto| and shall return the balance of the reviewed submittal to the Contractor for <br />action. The Contractor aho|i furnishany corrected submittal to the CN1AR for forwarding to <br />. <br />the Designer. The CK8AFlshall retain three ( 'copies uf the corrected submittal for the <br />records of the CK8AR and the Designer, and VvU|.return'the balance of the reviewed <br />submittal to the Contractor. <br />substitutions will bo accepted after the bids have been <br />' received. All substitutions prior to the receipt of bids shall be in accordance with the <br />� <br />Contract Documents. <br />' TheControotorenknovvedgenthatthoprooeouin0ofohoodrovvDgaandotheraubnRk±ahaim <br />directly impacted by the clarity, completeness, and accuracy of s * aid documents and that it |a the Contractor's responsibility coordinate each submittal with all other <br />related or affected Work and Ui\ oppcoVe each oub[nU±a| before submitting same to the <br />CK8AR for approval. <br />0.3 No substitutions and no deviations from requirement of the Contract Documents shall <br />be deemed allowed unless the Contractor has specifically informed the CMAR in writing of <br />such deviations at the time of submittal and the Designer and the Owner have given written <br />and specific approval to the substitutions or deviations.. In. proposing a deviation or <br />or upp'uv^m by the Designer ur the Owner, that the <br />to or better in quality and for the purpose intended, and that* the Contractor shall not by <br />reason of any such review, allowance or approval be relieved from any obligation or <br />responsibility contained in the Contract <br />'GENEBALCOND|T0NS FOR CK8AT RISK PROJECT :18of42 ' JUNE 2OO7 EDITION - <br />