Orange County NC Website
vvould' * <br />; however, the Contractor shall not be entitled to infer from --' --,,---_--_. <br />any fact or condition which would'rdtbe inferred bya contractor having knowledge and <br />experience. with einnUor work and, if the CK8AR-supplied information in inadequate. or <br />insufficient in any* respect, the Contractor shall be required to obtain independently such <br />other information as a knowledgeable and experienced contractor would prudently obtain in <br />' <br />order toevaluate any such condition. <br />3.3 The Contractor specifically acknowledges familiarity with all Federa State, local ' laws, <br />ordinances, rules, and regulations which may in any manner affect those engaged' or <br />employed in the Work, or the materials or equipment in or about the Work, or in any way effect the conduct of the Work and agrees that the Contractor and the -Contractor's <br />employees, 8ubnontrocto[n, and oUppUgro vvU|, at all timeo, comply with same. If the <br />Contractor shall discover any provisions in the Contract Documents which are contrary to <br />or inconsistent with any such |ovv' ordinance, ru|e, or uagu|oUon' the Contractor ahoU <br />immediately give notice thereof to the CYWAR in writing, identifying any items of Work <br />offeohsd. and the Contractor shall not pnooead unU|the Contractor has received written <br />direction from the CW1ARvvith respect tothese items. If the Contractor performs contrary to <br />or inconsistently with any such |aVv, ordinanco, rule, or regulation without giving such' <br />notice, the Contractor shall bear all costs whjoh are. auon�mquenceof such pe�ormanoe. <br />. � ` <br />` <br />3'4 At times selected by the CK4AR after mxeouilon bv . the'Conbactor of -the . Conotnuc� ` �on . <br />e pre-construction conference ohe|| be scheduled and oonduoted.for 'the <br />ARTICLE 4. BONDS <br />. <br />4.1 A performance bond |n the full amount of the Contract Price, and eU ftuohaD0eainthe <br />Contract Price, may be required of the Contractor to guarantee * the faithful pe'rform'ance -of <br />�e Work in compliance with the Contract Documents, in such �nn <br />on may be re O ired by <br />law and by the Owner. If required,' the bond shall be dated. the. same d . ae'Ule <br />Construction Agreement and must be accompanied bya current copy. ofthe power of <br />attorney for the attorney-in-foot executing such bond on' behalf of a surety company <br />licensed todo business in the state of North Carolina. <br />42 & payment bond inthe full amount of the Contract Price, and subject to changes inthe <br />Contract Price, may be required of the Contractor to guarantee the payment of all labor and <br />material costs or claims in connection with compliance with the Contract." If required, the <br />payment bond shall be in such form as may be required by'. law and by the�Owner. Said <br />bond.oha|( be dated and executed in the same manner as the performance bond in <br />paragraph 4.1. <br />ARTICLE 5. INSURANCE �JN0 <br />����Q��y�[�� <br />� <br />'5.1 CONTRACTOR PROVIDED INSURANCE <br />The Contractor ohoU without limiting its obligations or liabilities, for and <br />maintain. such insurance as IS Tequired by law and as is required by �fie Agreement to <br />when the loan to the Owner is secured by the which the Project <br />claims for damages for bodily including Ueatk dtnom claims for property-damag <br />. <br />which may arlse.frorn the Contractor's or its representatives',. consultants', Subcontractors', <br />ogonby. or employees' operations under this Agreement. - Such insurance shall bemfthe <br />kinds and have limits 6f1iobUi d coverages not less than the minimum limits hereinafter <br />opecifiador required by law, whichever )agreater. The CW1AR makes. po representation eo <br />bz the adequacy or sufficiency ofsuch odvensQen. The following requiren�entd-nhpU 16*no <br />� GENERAL CONDITIONS FOR CK8AFRISK PROJECT. 8of42' �� `'� � � ­JUNE20OTED[TK]N <br />