Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.36 <br />Subcontractor - A person, firm, or-corporation who has entered into "a direct contract with <br />the Contractor to perform any of the Work at the Project. <br />1.37 <br />Submittal - Shop.drawings, product data, samples, and other documents required by the <br />Contract Documents to be submitted by the Contractor to the CMAR and the Designer. <br />1.38 <br />Submittal Register.- See paragraph 13.2 of these General Conditions. <br />1.39 <br />Substantial Completion - The point at which the Work, and Work by other Contractors on or <br />in connection with the Project, as determined by the Designer,• is sufficiently complete in <br />accordance with the Contract Documents that it can be beneficially occupied by the Owner, <br />and the Work can be utilized by the Owner for its intended use, and all necessary permits <br />and permissions for Beneficial Occupancy and utilization having been obtained by. the <br />Contractor.. AII, operations and maintenance manuals, Owner training, and as -built <br />drawings must be submitted prior to Substantial Completion' being achieved. <br />1.40 <br />Sub - subcontractor - A person or entity that has a direct or indirect contract with a <br />Subcontractor to perform any of the Work at the Project. <br />1.41 <br />Work'- The construction and services required by the Contract Documents, including all <br />'materials, <br />labor, equipment, and services provided or to be provided by the Contractor to <br />fulfill the Contractor's obligations. <br />1.42 <br />All references in the Contract Documents to the masculine shall be interpreted 'as including <br />the feminine or neuter and all references in the Contract Documents to the singular or the <br />plural shall be interpreted as including the other, as may be appropriate in the reasonable <br />interpretation of the Contract Documents. <br />ARTICLE 2. <br />CORRELATION, INTERPRETATION AND INTENT OF CONTRACT DOCUMENTS <br />2.1 <br />It is the intent of the Specifications and Drawings and other Contract Documents to• <br />describe a complete Project in accordance with the Contract Documents. <br />2.2 <br />The Contract Documents are complementary; what is called for by one is as binding.as if <br />. <br />called for by all. If the Contractor finds a conflict, error or discrepancy in the Contract <br />Documents, the Contractor shall notify the CMAR in writing before proceeding with the <br />Work affected thereby. In resolving such conflicts, errors and discrepancies, the Contract <br />Documents shall be given preference in the following order: Construction Agreement, <br />Modifications, Addenda, Supplemental Conditions, General Conditions, Specifications, - and' <br />Drawings.. Figure dimensions on Drawings shall govern over scale dimensions, and <br />detailed Drawings shall govern over general Drawings. Any Work that may reasonably be .:. <br />inferred from the Contract Documents as being required to produce the intended result <br />shall 'be supplied whether or not it is specifically called for. Work, materials or equipment ' <br />described in words which, so applied, have a well known technical trade meaning shall be - <br />deemed to refer to such meaning and to incorporate any recognized standards which are a <br />part of such meaning. <br />2.3 <br />Miscellaneous items, accessories and work which are not specifically mentioned, but which <br />are essential to produce a complete and properly operating .installation, or useable <br />structure or plant providing the indicated function shall be furnished and installed without <br />change in the Contract Price.' Such miscellaneous items and accessories shall be of the ' <br />same quality standards, including material, style, finish, strength, class, weight and other <br />applicable characteristics, as specified for the major component of which the miscellaneous • <br />item or accessory is an essential part, and shall be approved by the Designer before.'..' <br />installation. This requirement is not intended to include major components not covered by* <br />or inferable from the Contract Documents. <br />GENERAL CONDITIONS FOR CM'AT RISK PROJECT- 6 of 42 JUNE 2007 EDITION .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.