Orange County NC Website
Elements contained in Appendix B. Within thirty (30) days <br />after execution of this Agreement, the CMAR shall present a <br />General Conditions cost proposal, Including its itemization of <br />estimated General Conditions costs and a cash flow schedule <br />for payments of General Conditions costs over the duration of <br />the Project. At the time the Guaranteed Maximum Price is <br />fixed, General Conditions Costs to be Included in the <br />Guaranteed Maximum Price shall be fixed as a lump sum, <br />based on line item estimates in a tabulation with cost elements <br />at least as detailed as the cost elements in Appendix B. The <br />following guidelines shall apply when calculating the lump sum <br />for General Conditions: <br />7.4.2.1 Unless a schedule of personnel rates are agreed to in <br />writing in an amendment to the Agreement, field personnel <br />costs may be reimbursed at direct personnel <br />expenses /employee costs (direct salary) plus all customary <br />payroll benefits [ncluding but not limited to FICA, SUTA, FUTA, <br />401K, vacation leave, sick leave, holidays, jury duty leave and <br />bereavement leave]. with no employee overhead mark up. The <br />on -site field staff is limited to full time staff which includes the <br />project manager, project engineer, field engineer, <br />superintendent(s) actually furnishing services to the Project, <br />and field clerical staff, as amended from time to time by <br />agreement of the parties. Other' CMAR positions will be <br />deemed included in the CMAR Fixed Fee; <br />7.4.2.2 Independent engineers, architects and other <br />consultants employed by the CMAR and deemed necessary by <br />the Owner at the reasonable prevailing hourly rates for such <br />services. Any consultants employed by the CMAR for the <br />Project must be approved in advance by the Owner prior to <br />performing work. <br />7.4.2.3 Travel Expenses: All travel, by any conveyance, <br />required for the Project, outside of Orange County, <br />7.4.2.4 Temporary Facilities: Field office(s) with telephone <br />service and high- speed Internet connections and field office <br />computers, as needed, for Project tracking purposes. All <br />software for use on computers (accounting, tracking, <br />scheduling, word processing, AutoCAD, Project management <br />etc.), otherwise shall be included in General Conditions. Field <br />office temporary electric, heating, water, sanitation, and <br />electronic equipment maintenance and field office operation <br />costs, e.g., stationary, postage, etc., shall be incurred <br />24 <br />judiciously. General Conditions shall include maintenance of an <br />appropriate shipping and receiving system. <br />7.4.2.5 Plans /Surveys /Permitsffesfing: Reproduction of <br />Construction Documents as needed by the CMAR and <br />approved in advance by the Owner. Surveyor's services (site <br />layout, etc.), as required. Apply for and take delivery of all <br />required permits (fee for permits to be paid directly by Owner <br />unless otherwise directed by the Owner). <br />7.4.2.6 Safety /Cleanup: Establish and maintain an on -site <br />safety' program throughout'the construction phases. (Note: The <br />cost of home office safety personnel is Included in the CMAR <br />Fee.) Install and maintain temporary facilities, as required: <br />safety barricades, partitions, ladders, stairs, . site fencing, <br />signage, first aid, traffrc'control devices, etc. Provide daily site <br />clean up, trash collection, and removal. Provide and maintain <br />site security throughout Project construction phases. Provide <br />site snow removal, as may be required throughout Project <br />construction phases. <br />7.4.2.7 General: Provide temporary weather and dust <br />protection (that which must practically remain outside of <br />contracts) as may be required during construction phases. <br />Provide field personnel pagers, and two -way radio throughout <br />the construction phases, as applicable. Include travel expenses <br />for field personnel related to off -site equipmentImaterials <br />survey and inspections. <br />7.4.2.8 Insurance /Bond: Provide 100% Performance and <br />Payment Bonds. Provide liability Insurance and provide <br />builder's risk insurance policy in the amount of the Guaranteed <br />Maximum Price unless directed otherwise- by Owner in <br />accordance with an OCIP. <br />7.4.2.9 Close- Out/De- Mobilization: Provide final site /facility <br />clean up. Provide final release of liens for all contracts. Provide <br />sets of all Contractor as -built drawings to the Owner and <br />Designer; one set will be used by the Designer to prepare as- <br />built drawings. <br />7.4.3 Construction Manager's Accounting Records <br />Records for the Cost of the Work, the CMAR's personnel <br />expenses, independent engineer's fees, other consultant's fees <br />and direct expenses pertaining to the Project shall be <br />.maintained on the basis of generally accepted accounting <br />practices and shall be available for inspection by the Owner <br />