Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RGSOLUTSHillsborough Office Commons Phase Two - GMP Proposal <br />THE RESOLUTE BUILDING COMPANY Document List <br />3/17/2009 <br />Discipline <br />ID <br />Document Description <br />Date Revision <br />Number <br />Drawings <br />COA <br />Cover Sheet <br />02/06/09 <br />CO-2 <br />Code Information Sheet <br />01/15/09 <br />CO-3 <br />Code Information Sheet <br />01/15/09 — <br />Civil <br />C1.0 <br />Existing Site Plan <br />01/15/09 <br />CIA <br />Proposed Site Plan <br />01/15/09 — <br />Structural <br />S1.1 <br />Foundation & Framing Plans & Details <br />01/15/09 <br />Architectural <br />A1.0 <br />Schematic Floor Plan <br />02/06/09 <br />A1.1 <br />Floor Plan Part A <br />02/06/09 <br />A1.2 <br />Floor Plan Part B <br />02/06/09 <br />A1.3 <br />Floor Plan Part C <br />01/15/09 <br />A1.4 <br />Enlarged Floor Plans <br />02/06/09 <br />A2.1 <br />Ceiling Plan Part A <br />01/15/09 <br />A2.2 <br />Ceiling Plan Part B <br />02/06/09 <br />AM <br />Partial Building Elevations <br />02/06/09 <br />A3.2 <br />Partial Interior Elevations <br />01/15/09 <br />A4.1 <br />Building Sections and Details <br />01/15/09 <br />A5.1 <br />Casework Elevations and Interior Details <br />01/15/09 <br />A5.2 <br />Casework Elevations and Interior Details <br />12/15/08 <br />A6.1 <br />Door and Frame Schedule <br />02/06/09 <br />A6.2 <br />Door and Frame Types and Details <br />01/15/09 <br />A7.0 <br />Room Finish Schedule <br />02/06/09 <br />Fire Protection <br />FP1.0 <br />Overall Fire Protection Plan <br />02/03/09 <br />FP1.1 <br />Fire Protection Details <br />02/03/09 <br />Plumbing <br />P0.0 <br />Partial Under Slab Plumbing Floor Plan <br />01/15/09 <br />P0.1 <br />Partial Under Slab Plumbing Floor Plan <br />02/03/09 <br />P1.0 <br />Partial Plumbing Floor Plan <br />01/15/09 <br />P1.1 <br />Partial Plumbing Floor Plan <br />02/03/09 <br />P2.0 <br />Enlarged Plumbing Floor Plans <br />01/15/09 <br />P3.0 <br />Plumbing Schedule and Details <br />02/03109 <br />Mechanical <br />MIA <br />Mechanical Summary and Schedules <br />02/03/09 <br />M2.1 <br />Mechanical Plan <br />02/03/09 <br />M2.2 <br />Mechanical Plan <br />02/03109 <br />M2.3 <br />Mechanical Zone and Address Plan <br />01/21/09 <br />M3.1 <br />Mechanical Roof Plan <br />01/21/09 <br />1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.