Orange County NC Website
Tfi—eRESOLUTE 13ru`I1d1ng company 5Preaa6heeYi2ep6-r-t -- Page 3 <br />HOC Phase 2 AIL A -4 31191200911:38 AM <br />Estimate Totals <br />Labor <br />Material <br />Subcontract <br />13,717 <br />0.294 /SF <br />89.06% <br />Equipment <br />Other <br />Subtotal <br />13,717 13,717 <br />0.294 tSF <br />89.06 89.06% <br />Sales Tax (6.75 %) <br />C <br />Labor Fdnaes <br />C <br />Sidra Raft Non Corn Annual Rate <br />11 <br />C <br />0.000 /SF <br />0.07% <br />AGO Fee <br />14 <br />T <br />0.000 /SF <br />0.09% <br />General Uabllity Insurance <br />110 <br />C <br />0.002 /SF <br />0.71% <br />Construction Contincenav (3%) <br />416 <br />T <br />0.009 /SF <br />2.70% <br />Fee (7 %) <br />999 <br />T <br />0.021 /SF <br />6.48% <br />BOND <br />135 <br />B <br />0.003 /SF <br />0.87% <br />Total <br />15,402 <br />0.330 /SF <br />