Orange County NC Website
The RESOLUTE BuOding CompanySpreadheett epos _ _ P9ge 3 — <br />HOC Phase 2 Alt A -3 31191200911:34 AM <br />Estimate Totals <br />. , .. escrtptfon ., ,,,Amount <br />, -_;', __ totals . . _ . • _., ,;;, „ GosBasis„ <br />Cost per Untt . ,Percent <br />oft ?otal, . ,, :?, <br />Labor <br />Material <br />Subcontract <br />17,175 <br />0.368 /SF <br />89.07% <br />Equipment <br />Other <br />Subtotal <br />17,175 <br />17,175 <br />0.366 /SF <br />89.07 89.07% <br />Sales Tax (6.75 %) <br />C <br />Labor Frinaes <br />C <br />Bidrs Rsk Non Corn Annual Rate <br />14 <br />C <br />0.000 ISF <br />0.07% <br />General Liability Insurance <br />137 <br />C <br />0.003 /SF <br />0.71% <br />AGO Fee <br />17 <br />T <br />0.000 /SF <br />0.09% <br />Construction ConBnaencv (3%) <br />520 <br />T <br />0.011 ISF <br />2.70 % <br />Fee (7%) <br />1.250 <br />T <br />0.027 /SF <br />6.49% <br />BOND <br />169 <br />8 <br />0.004 /SF <br />0.88% <br />Total <br />19,282 <br />0.413 /SF <br />