Orange County NC Website
3M7/2O09 <br />' The following Alternates have NOT been included in the G08P. They <br />may be added to the GD0P <br />via change order mraddendum. <br />Alternate <br />�HtenmoteDeac�ption <br />ADD or <br />Alternate <br />Number <br />DEDUCT <br />Amount <br />1 <br />All exterior Foyede Treatment |obobe performed, including <br />ADD <br />$ 115.136 <br />demolition nf sidewalks, tie in roof leaders, footings, brick <br />` <br />masonry, precast concrete caps, patch oidna|ke.masonry <br />p|ero, structural steel, roofing, metal framing, BFG8ando. <br />\ <br />Fascias, Soffits and Cornice. There are two allowances for this <br />a|terotabo include: Exterior Building Sign ($14488) and Exterior <br />� <br />Lighting ($4000). <br />2 <br />Add two additional barrel-vault skylights ho include roof <br />ADO <br />$ 38.503 <br />� <br />patching, material and installation. One |n commons area 46O <br />and one |n commons area 650. <br />| 3 <br />All surfaces shown on the finish schedule to receive vinyl wall <br />ADD <br />$18.282 <br />covering tobe included per plans and specifications. <br />, 4 <br />Add Acoustical Wall Panels in the Common Areas. This <br />ADD <br />$15,402 <br />will include material installation and painting. <br />i G <br />Waterproof Retaining Wall per attached scope of work from 5th <br />ADD <br />Wall Consultants. <br />G <br />Remedial Roofing oo Specified by attached scope of work and <br />ADD <br />$18'919 <br />| <br />' <br />the aUmwancod amounts listed from 5th Wall Consultants. <br />� <br />� <br />� <br />� <br />` <br />/ Phase noo' Estimate mternatusx <br />| � <br />