Orange County NC Website
RIESOLUTIS <br />THE RESOLUTE BUILDING COMPANY <br />Hillsborough Office Commons Phase Two — GMP Proposal <br />Criteria <br />3. The GIVIP Proposal includes 1 ductless split system for telecom equipment room at rear of <br />the building per the design documents. <br />4. The GIVIP Proposal includes providing and installing 5 rooftop replacement units. <br />5. The GIVIP Proposal includes one electric wall heater. <br />6. The GIVIP Proposal includes a ducted return system. <br />7. Provide and install web based DDC control system with an estimated 70 zones per plans. <br />8. The GIVIP Proposal does not include any warranties or repairs on existing HVAC <br />Equipment. <br />Division 16: Electrical <br />1 The GIVIP Proposal is based on IVIC cable for all branch circuitry in walls and accessible <br />ceilings. <br />2. The GIVIP Proposal is based on replacing the existing Fire Alarm system. <br />3. The GIVIP Proposal has excluded new telecommunication cabling, removal of abandoned <br />cabling, equipment or servers. <br />4. The GIVIP Proposal does not include new panels or feeders as they are shown existing on <br />the design documents. <br />5. The GIVIP Proposal excludes site parking lighting as this is anticipated to be existing. <br />6. The GIVIP Proposal is based on the use of existing service and transformers. <br />7. The GIVIP Proposal includes an allowance for the rough in of audio visual systems, <br />podium, flat panel monitors, enclosed bulletin boards, electronic message boards, <br />Panduit, ceiling mounted projectors, and smart boards per the drawings. <br />8. The GIVIP Proposal includes back-up generators to support IT rooms only per the <br />drawings. <br />9. The GIVIP Proposal includes the demolition of existing electrical wiring and conduit as <br />required by local inspection authority. <br />HAEMPROJECTS\HCURGIVIP Phase 2X4 - Proposal Criterial.doc 10 <br />