Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIESOLUTIS <br />THE RESOLUTE BUILDING COMPANY <br />Hillsborough Office Commons Phase Two — GMP Proposal <br />Criteria <br />3. The GIVIP Proposal includes 1 ductless split system for telecom equipment room at rear of <br />the building per the design documents. <br />4. The GIVIP Proposal includes providing and installing 5 rooftop replacement units. <br />5. The GIVIP Proposal includes one electric wall heater. <br />6. The GIVIP Proposal includes a ducted return system. <br />7. Provide and install web based DDC control system with an estimated 70 zones per plans. <br />8. The GIVIP Proposal does not include any warranties or repairs on existing HVAC <br />Equipment. <br />Division 16: Electrical <br />1 The GIVIP Proposal is based on IVIC cable for all branch circuitry in walls and accessible <br />ceilings. <br />2. The GIVIP Proposal is based on replacing the existing Fire Alarm system. <br />3. The GIVIP Proposal has excluded new telecommunication cabling, removal of abandoned <br />cabling, equipment or servers. <br />4. The GIVIP Proposal does not include new panels or feeders as they are shown existing on <br />the design documents. <br />5. The GIVIP Proposal excludes site parking lighting as this is anticipated to be existing. <br />6. The GIVIP Proposal is based on the use of existing service and transformers. <br />7. The GIVIP Proposal includes an allowance for the rough in of audio visual systems, <br />podium, flat panel monitors, enclosed bulletin boards, electronic message boards, <br />Panduit, ceiling mounted projectors, and smart boards per the drawings. <br />8. The GIVIP Proposal includes back-up generators to support IT rooms only per the <br />drawings. <br />9. The GIVIP Proposal includes the demolition of existing electrical wiring and conduit as <br />required by local inspection authority. <br />HAEMPROJECTS\HCURGIVIP Phase 2X4 - Proposal Criterial.doc 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.