Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R"IESOLUTS Hillsborough Office Commons Phase Two — GMP Proposal <br />THE RESOLUTE BUILDING COMPANY Criteria <br />3. The GMP Proposal has not anticipated any special shut down costs such as line freezing <br />or installing new isolation valves to accommodate PME systems renovations. <br />4. The GMP Proposal has not anticipated seismic bracing or special vibration isolation. <br />5. In general, The GMP Proposal is based on trade contractor interpretation of final product <br />intent. This interpretation may vary from that indicated by the documents. <br />Division IS: Fire Protection Systems <br />1 The GMP Proposal includes Fire Protection Systems. The Proposal is based on the <br />understanding that existing systems will support (appropriate flow capacity) the <br />modifications that may be required. Sprinkler systems are anticipated to be light hazard <br />occupancy. Heads shall be chrome semi-recessed. <br />2. The GMP Proposal is based on leaving existing sprinkler mains and laterals in areas that <br />shall be renovated. The intent is that heads will be relocated without re-constructing the <br />entire system. <br />3. No FM-200 or dry systems are included in The GMP Proposal. <br />4. No fire pumps are included as it is assumed that current water pressure is appropriate. <br />Division 16: Plumbing Systems <br />1. The GMP Proposal includes Plumbing systems per the design documents. <br />2. The GMP Proposal does not include any roof gutters. No secondary or emergency <br />overflow drains have been anticipated. <br />3. The GMP Proposal is based on tapping and then utilizing the existing water system. <br />4. The GMP Proposal includes an under-counter grease interceptor system for food prep <br />area. <br />5. All waste and vent piping to be PVC. <br />6. All water piping to be copper. <br />Division IS: HVAC Systems <br />1. The GMP Proposal includes sheet metal and flexible duct system per the plans. <br />2. The GMP Proposal includes W lay in supply grills with Egg Crate return grills. <br />H:\EXP\PROJECTSNHCUFXGMP Phase 2W - Proposal Criterial.doe <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.