Orange County NC Website
RESOLUTE <br />Hillsborough Office Commons Phase Two — GMP Proposal <br />THE RESOLUTE BUILDING COMPANY Criteria <br />5. The GMP Proposal includes an allowance for stainless steel corner guards in corridors <br />only. <br />6. The GMP Proposal includes grab bars at toilets. <br />7. The GMP Proposal includes baby changing stations per the design drawings. <br />8. The GMP Proposal included sanitary napkin disposals in women's toilets. <br />9. The GMP Proposal includes coat hooks at all office doors. <br />10. The GMP Proposal includes twenty half height standard metal lockers. <br />11. The following items are supplied by the owner and installed by the contractor: toilet tissue <br />dispensers, toilet seat cover dispensers, soap dish, and paper towel dispenser. <br />12. The GMP Proposal includes an allowance for cork rails, wall talkers, projection screens, <br />and pencil rails in all conference rooms. See Allowance. <br />Division 11: Equipment <br />1 The GMP Proposal includes installation of appliances provided by owner. The CIVIAR <br />carries no appliances in the budget. <br />Division 12: Furnishings <br />1 The GMP Proposal has excluded any furnishings as it is anticipated that this will be <br />provided and installed by the Owner. <br />Division 13: Special Construction <br />1. Canopies are not included. <br />Division 14: Conveying Systems <br />1. Not Used <br />Division 15: General <br />1 The GMP Proposal is based on appropriate existing equipment, piping and utility <br />capacities or sizes to accommodate the new addition and renovations. <br />2. The GMP Proposal excludes painting of any piping or duct system as it is anticipated this <br />shall not be required. If requested by the Owner, this can be added later. <br />H:\EXP\PROJECTS\HCUF\GMP Phase 2\4 - Proposal Criterial.doc 8 <br />