Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIESOLUTIE Hillsborough Office Commons Phase Two — GMP Proposal <br />THE RESOLUTE BUILDING COMPANY Criteria <br />9. The GMP Proposal includes mirrors at bathrooms. <br />10. In general, The GMP Proposal is based on reducing window frame sizes in lieu of that <br />shown on the documents per discussions held in previous collaboration meetings. <br />11. The GMP Proposal includes an allowance for fourteen convex mirrors to include <br />installation and adjustment. See Allowance. <br />12. The GMP Proposal includes two acrylic barrel continually vaulted skylights with 20 degree <br />rise. Finish to be clear over white mill finished aluminum. Light transfer is 47% with a 301b <br />live load capacity. Sizes will be 6' x 77' for the large common are and 6' x 38' for the small <br />common area. We do not include pre-manufactured roof curbs. A second set of skylights <br />is included as an add alternate. <br />Division 9: Finishes <br />The GMP Proposal includes interior light gauge framing and gypsum board systems with <br />gypsum board ceilings in all bathrooms. <br />2. The GMP Proposal includes ceramic floor and wall tile in restrooms. Ceramic wall tile is <br />included at wet walls only per the plans. <br />3. The GMP Proposal includes 2x2' Square Edge Optima Acoustical Ceiling Tile and Grid <br />system. <br />4. The GMP Proposal includes VCT, Carpet and Carpet Tile per the plans and <br />specifications. Existing VCT tile is to remain with floor patching at voids and transition <br />from VCT to concrete floor is included. <br />5. The GMP Proposal includes painting of walls, wood trim, HIVI window and door frames <br />and gypsum ceilings as required. No.Special coating systems have been included. <br />6. The GMP Proposal does not include any vinyl wall coverings. This has been priced as an <br />alternate. <br />7. The GMP Proposal does not contain any sound attenuation panels in the courtyard areas. <br />Division 10: Specialties <br />1. The GMP Proposal includes solid plastic Toilet Partitions. <br />2. The GMP Proposal includes Fire Extinguishers and Semi - Recessed Cabinets. <br />3. The GMP Proposal includes an allowance for Signage. See Allowance. <br />4. The GMP Proposal includes Window blinds. <br />H:\EXP\PROJECTS\HCURGMP Phase 2\4 - Proposal Criterial.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.