Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIESOLUTIE Hillsborough Office Commons Phase Two — GMP Proposal <br />THE RESOLUTE BUILDING COMPANY Criteria <br />3. The GMP Proposal includes custom made cabinetry. Cabinet box interiors shall be <br />melamine. All elements visually exposed to exterior shall be plastic laminate. <br />Countertops shall be plastic laminate. Hardware to include full extension drawer slides <br />with brushed aluminum pulls and locks. <br />4. The GMP Proposal includes temporary wood closures for all new masonry openings. <br />Division 7: Thermal & Moisture Protection <br />1. The GMP Proposal includes fire sealing of penetrations as may be required. <br />2. The GMP Proposal includes sound attenuation above lay-in ceilings at all conference and <br />interview rooms per the drawings. Additional rooms may be added if later requested by <br />the Owner. <br />3. The GMP Proposal includes patching of the existing EPDM roofing membrane at <br />penetrations by new work and skylights only. This new work will bear a one year warranty. <br />All other roofing work and warranty is to be the responsibility of the landlord/owner. <br />4. The GMP Proposal has not anticipated any waterproofing at the existing building retaining <br />wall. This Item is expected to be handled directly by the landlord/owner. <br />5. The GMP Proposal includes insulation in walls between offices and at all conference and <br />meeting rooms per the drawings. No insulation is included in corridor walls at offices. <br />Division 8: Doors and Windows <br />The GMP Proposal includes Hollow Metal Window Frames and Doors at building interior, <br />Factory Finished Wood Doors and Door Finish Hardware per the specifications. <br />2. The GMP Proposal includes FRP doors. <br />3. The GMP Proposal includes rough in for five doors with card reader access by owner. <br />4. The GMP Proposal includes eleven aluminum storefront windows at the front of the <br />building only and door systems. <br />5. The GMP Proposal includes two automatic door operators at main entry only. <br />6. The GMP Proposal is based on manufacturer's standard profile clear anodized aluminum <br />storefront frames with manufacturers standard 1" insulated tinted glazing (exterior <br />windows). <br />7. The GMP Proposal excludes glazing frit patterns, colored glass, or etched glass as none <br />are anticipated. <br />8. The GMP Proposal includes one way mirrored glass in rooms 330A, 331A and 332A only. <br />HAEXP\PR0JECTS\HCUF\GMP Phase 2\4 - Proposal Criterial.doc 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.