Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />RIESOLUTE Hillsborough Office Commons Phase Two — GMP Proposal <br />THE RESOLUTE BUILDING COMPANY Criteria <br />Division 3: Concrete <br />1 The GMP Proposal includes concrete slab on grade to patch trenches for new plumbing <br />underground and electrical floor boxes. Concrete for slabs on grade shall be 3,000 psi, 4" <br />thick, wire mesh reinforced, placed on 6mil plastic vapor barrier on top of 4" stone <br />subgrade. <br />2. The GMP Proposal excludes any concrete work or special finishes, aggregates, <br />admixtures or mix designs. Should the Owner request any of these items, they may be <br />added later. <br />3. The GMP Proposal includes concrete footings for interior columns at main entry per the <br />design documents. All concrete to be 3,000 psi. <br />Division 4: Masonry <br />1 The GMP Proposal includes block masonry construction for patching interior and exterior <br />walls for openings at the front of the building and at the interior of the main entry as <br />indicated by the documents. <br />2. The GMP Proposal is based on patching existing block and may not be a perfect match to <br />the existing block. <br />Division 6: Steel <br />1. The GMP Proposal includes Structural Steel construction as indicated by the documents <br />2. The GMP Proposal includes Miscellaneous Steel construction for lintels at new door and <br />window openings along the front of the building. <br />3. The GMP Proposal includes Miscellaneous Steel construction for pipe rails at rear <br />handicap ramp and skylight support bracing. <br />4. The GMP Proposal has not anticipated any special shapes, fabrication, or coatings as <br />none are anticipated to be required. <br />Division 6: Woods and Plastics <br />1 The GMP Proposal includes in-wall blocking and nailers for wall mounted items. In-wall <br />blocking shall be fire retardant wood or metal. <br />2. The GMP Proposal includes roof nailers and roof blocking for installation of skylights only. <br />HAEMPROJECTSWCURGIVII? Phase Z4 - Proposal Criterlal.doc 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.