Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTE Hillsborough Office Commons Phase Two — GMP Proposal <br />THE RESOLUTE BUILDING COMPANY Criteria <br />7. The GMP Proposal and Schedule are based on historically average weather conditions <br />The CM will endeavor to minimize cost or time implications associated with abnormal <br />weather. <br />Division 2: Sitework <br />1. The GMP Proposal is based on the Owner removing and / or relocating all items other <br />than those listed in the drawings. An allowance has been included to clean up the <br />mezzanine area at the rear of the building to include some electrical re -work and small <br />modifications as needed. <br />2. The GMP Proposal excludes contingencies or allowances for the removal and /or <br />replacement of unsuitable soils or rock. Should unforeseen unsuitable soils or un- rippable <br />rock be encountered, the scope of work can be added for removal and replacement. <br />3. The GMP Proposal excludes contingencies or allowances for abnormal water removal. <br />Should unforeseen water be encountered, the scope of work can be added for removal. <br />4. The GMP Proposal does include striping, signage and wheel stops for handicap parking <br />spaces. A drop off area has not been defined and no funds have been reserved for this <br />work. <br />5. The GMP Proposal includes treating the soils beneath new interior slabs on grade for <br />prevention of insect pests. <br />6. The GMP Proposal includes Selective Building Demolition to allow for new construction or <br />renovation per the design drawings and the proposal criteria. These items include <br />acoustical ceilings, carpet, storefront, cutting masonry openings at front of the building, <br />existing rails inside building, shelving hangers, existing handicap ramp at rear of building, <br />plumbing fixtures, walls at existing bathrooms, wall at sprinkler riser, wall at electrical <br />panels at front of the building and cutting holes for skylights. <br />7. The GMP Proposal does not include temporary constructions for dust, noise, and traffic <br />control as none is anticipated. <br />8. The GMP Proposal include removing and replacing the Handicap Ramp at the rear of the <br />building as will be required to meet current building code. <br />9. The GMP Proposal includes an allowance to clean up around the exterior of the building. <br />See Allowances. <br />10. The GMP Proposal includes an allowance for landscaping and tree removal. See <br />Allowances. <br />H: \EXP \PROJECTS \HCUF\GMP Phase 2\4 - Proposal Criterial.doc q <br />
The URL can be used to link to this page
Your browser does not support the video tag.