RESOLUTE Hillsborough Office Commons Phase Two — GMP Proposal <br />THE RESOLUTE BUILDING COMPANY Criteria <br />21. The GMP Proposal has excluded certified testing and balancing of HVAC systems by an <br />Independent Third Party Testing Agency. The contractor will not guarantee existing <br />systems but will endeavor to test and balance them to the best of it's ability. <br />22. The GMP Proposal has excluded materials testing and inspections. The Proposal is <br />based on the understanding that the Owner will provide all material testing and <br />inspections. If requested by the Owner, this may be added to the CM's scope of work <br />later. <br />23. The GMP Proposal has excluded contingencies or allowances for potential cost <br />associated with work before or after normal business hours or multiple shifts for the Ws <br />personnel and/or Subcontractors. The Proposal does account for certain project <br />components that may require brief off-hour effort. <br />24. The GMP Proposal has excluded contingencies or allowances for premiums in cost <br />associated with CM, Subcontract or Vendor overtime or premium time. The Proposal <br />does account for certain project components that may require brief premium time effort. <br />25. The GMP Proposal has excluded allowances for Licensed Final Land Surveys or <br />Certifications. If requested by the Owner, this may be added to the CM's scope of work <br />later. <br />26. The GMP Proposal is based on notwithstanding anything contained to the contrary in the <br />contract documents, this guaranteed maximum price, and its accompanying clarifications, <br />qualifications, exclusions and allowances shall take precedence over all other contract <br />documents, in case of a conflict or ambiguity between the contract documents. <br />Division 1: General Conditions <br />The GMP Proposal includes costs for the Demolition and Building Permit. <br />2. The GMP Proposal includes costs for Payment and Performance Bonds to be provided by <br />the CM. <br />3. The GMP Proposal includes General Liability Insurance premiums. <br />4. The GMP Proposal is based on reasonably clear and unobstructed use of the existing site <br />and facility by the CM and its Subcontractors for waste removal, material staging and <br />construction personnel with the ultimate intent of maintaining construction sequence and <br />time. The CM will cooperate with the Owner so as not to interfere with ongoing business <br />operations. <br />5. The GMP Proposal is based on material manufacturer's standard products, profiles, <br />colors, etc. In general, the Proposal has been compiled from industry standards and the <br />described design intent communicated to date. <br />6. The GMP Proposal is based on the CM and its Subcontractors being afforded the <br />opportunity, throughout the duration of the project, to provide substitutions of products or <br />methods that may reasonably benefit the project. <br />HAEMPROJECTSMUMINIP Phase Z4 - Proposal Criterial.doc 3 <br />