Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIESOLUTIE <br />THE RESOLUTE BUILDING COMPANY <br />Hillsborough Office Commons Phase Two — GMP Proposal <br />Criteria <br />10. The GMP Proposal is based on the CM and its Subcontractors providing industry standard <br />twelve (12) month warranty which shall commence the first day following the Substantial <br />Completion Date. <br />11. The GMP Proposal includes several ALLOWANCES. Certain allowances are intended to <br />be furnish and install (provide) allowances. Refer to the Proposal and attached list for <br />included allowances. <br />12. The GMP Proposal has included Builder's Risk Insurance. A one time, $1,000 Builder's <br />Risk Deductible, shall be the responsibility of the CM should the insurance policy be <br />utilized to recover costs. Builder's Risk covers the cost of the this work. The Owner or <br />Landlord is responsible for providing coverage for the existing building(s) and property. <br />13. The GMP Proposal has excluded contingencies or insurances for the repair or <br />replacement of damage to work in place caused by acts of terrorism or vandalism. The <br />CM will endeavor to minimize cost or time implications associated with any unforeseen <br />condition. <br />14. The GMP Proposal does not include temporary and permanent utility usage costs, <br />including but not limited to, telephone, internet, electricity, water, steam, sewer, chilled <br />water and gases, etc. It is anticipated that it will be less expensive for the Owner to allow <br />the CM to utilize the existing infrastructure for these services. The Proposal does include <br />costs for temporary installations for these services should they be required. <br />15. The GMP Proposal has excluded design fees, planning fees, use fees, impact fees, <br />development fees, capacity charges, escrows or taxes (except material sales tax). <br />16. The GMP Proposal has excluded costs associated with LEED or "Green Building" <br />requirements or fees as these requirements are not anticipated for this project. <br />17. The GMP Proposal has excluded Systems Commissioning. It is anticipated that elaborate <br />or intensive commissioning is not required for this project. The Proposal does include <br />industry standard systems start-up requirements that may have been utilized for similar <br />projects. <br />18. The GMP Proposal has excluded cleaning, testing, repairing, refurbishing, code upgrades <br />and recertification of existing systems or structures other than those listed in the design <br />documents or scope review. If requested by the Owner, these items may be added to the <br />CIVI's scope of work later. <br />19. The GMP Proposal has excluded any costs associated with Department of Insurance <br />Special Inspections. It has not been determined what the impact of this requirement may <br />entail. <br />20. The GMP Proposal has excluded contingencies or allowances for the detection and <br />removal of hazardous material (i.e., asbestos, lead paint, PCB's, mold, etc.). If hazardous <br />materials are anticipated, it is recommended that the Owner consult to conduct an <br />investigation of the facility and grounds. Should unforeseen abatement be required, the <br />CM shall reserve right to claim additional contract time should abatement be required <br />once the project has commenced. <br />HAEMPROJECTSWCURGIVIP Phase 214 - Proposal GrIterial.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.