Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY AGREEMENT FOR CONSTRUCTION <br />NORTH CAROLINA MANAGER AT RISK SERVICES <br />This AGREEMENT is made and effective on this date: November 6, 2008 <br />BETWEEN The Owner: <br />ORANGE COUNTY, NORTH CAROLINA (hereinafter referred to as "Owner" or "the Owner") <br />And the Construction Manager At Risk (hereinafter referred to as "CMAR" or "the CMAR"): <br />RESOLUTE BUILDING COMPANY, INC. <br />For services in connection with the Project known as: <br />The HILLSBOROUGH COMMMONS as further described in Article 2 <br />For which the Designer is: <br />CORLEY, REDFOOT, ZACK ARCHITECTS 8, ENGINEERS, ATTN: KEN REDFOOT, 222 CLOISTER <br />COURT, CHAPEL HILL, NC 27514 <br />The Owner and CMAR, in consideration of their mutual covenants herein, agree as set forth below: <br />TABLE OF CONTENTS <br />ARTICLE I - RELATIONSHIP OF THE PARTIES 4 <br />1.1 Owner and Construction Manager At Risk <br />1.2 Owner and Designer <br />1.3 CMAR and Contractors <br />1.4 Relationship of the CMAR to the Designer <br />ARTICLE 2 - PROJECT DEFINITION <br />ARTICLE 3- CONSTRUCTION MANAGER AT RISK'S SERVICES 4 <br />3.1 CMAR Services <br />3.2 CMAR Personnel <br />3.3 Construction Management Plan <br />3.4 Consultant Selection <br />3.5 Time Management <br />3.6 Cost Management <br />3.7 Management information System (MIS) <br />3.8 Design Phase Services <br />3.9 Procurement Phase <br />3.10 Construction Phase <br />3.11 Post Construction Phase <br />
The URL can be used to link to this page
Your browser does not support the video tag.