Orange County NC Website
"Your IP Communications -Convergence Partner" <br />Relational <br />Technology Soka#lot>ls <br />Phase 7- Cair.• RTS will install a G430 gateway and 1 UPS. RTS will install 34 IP End Points and 4 analog <br />at this location. Orange County will install the remaining 0 IP Endpoints. <br />Phase &- COSC.• RTS will install a G430 gateway and 1 UPS. RTS will install 0 IP End Points and 3 analog <br />at this location. Orange County will install the remaining 7 IP Endpoints. <br />phase 9- Sawyer RTS will install a G430 gateway and 1 UPS. RTS will install 11 IP End Points and 1 <br />analog at this location. Orange County will install the remaining 0 IP Endpoints. <br />Phase f0- OPT PW.• RTS will install a G430 gateway and 1 UPS. RTS will install 22 IP End Points and 5 <br />analog at this location. Orange County will install the remaining 0 IP Endpoints. <br />Phase 11- CS ANNEX.- Location will be connected via Copper through another existing gateway. RTS will <br />install 0 IP End Points and 11 analog at this location. Orange County will install the remaining 0 IP Endpoints. <br />Phase 12- Gafeway.• RTS will install a G430 gateway and 1 UPS. RTS will install 63 IP End Points and 6 <br />analog at this location. Orange County will install the remaining 0 IP Endpoints. <br />Phase 1~Jai/.• RTS will install a G430 gateway and 1 UPS. RTS will install 0 IP End Points and 2 analog at <br />this location. Orange County will install the remaining 6 IP Endpoints. <br />Phase 1¢ Justice: RTS will install a G430 gateway and 1 UPS. RTS will install 0 IP End Points and 3 <br />analog at this location. Orange County will install the remaining 39 IP Endpoints. <br />Adjunct Equipment and Other Services <br />RTS will provide Project Management of all services described above and will provide coordination between <br />RTS, ORANGE COUNTY. <br />RTS will provide end-user training on the ACM voice system telephones and CMM voice mail. RTS will not <br />provide configuration or training on Call Center adjunct systems (CCE) within this SOW. <br />Statement of Network Performance Responsibility: <br />In as much as RTS will be installing and configuring new LAN "edge" equipment that will directly connect all <br />components of the Avaya Aura voice system, RTS will take responsibility for proper configuration, testing, and <br />documentation to insure acceptable performance and coverage under Avaya Global Services Maintenance. <br />For these requirements, reference the Avaya LAN Administration Guide (http://preview.tinyurl.com/nt993g). <br />-20- <br />This document is proprietary and confidential to Relational Technology Solutions. <br />Unauthorized distribution is prohibited. <br />