Browse
Search
Agenda - 09-15-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 09-15-2009
>
Agenda - 09-15-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2009 10:00:58 AM
Creation date
9/11/2009 10:00:53 AM
Metadata
Fields
Template:
BOCC
Date
9/15/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
2009-076 ERCD - Orange Co and Preservation of the Eno River regarding Utilization of Former Water Supply Well
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
2009-077 ERCD-Orange Co and University of North Carolina at chapel Hill regarding Utilization of Former Water Supply Well
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
2009-078 ERCD-Orange Co and Duke University regarding Utilization of Former Water Supply Well
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20090915
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Estimate for Orange Well Net <br /> Itemized <br /> Cost Year 1 Year 2 Year 3 Subtotal <br />Estimated Cost to Install Each Saprolite Well 6,000.00 24,000.00 24,000.00 48,000.00 <br />Estimated Cost to Install Each Bedrock Well 11,000.00 11,000.00 11,000.00 <br />Cost for Transducers and Data Loggers 1,125.00 6,750.00 6,750.00 6,750.00 20,250.00 <br />Cost for Cable, dessicant and container, dock 430.00 2,580.00 2,580.00 2,580.00 7,740.00 <br />Miscellaneous Expenses, locks, well caps, etc. 1,400.00 1,000.00 1,000.00 3,400.00 <br />Surveying of Well Locations 3,000.00 3,000.00 6,000.00 <br />Laptop for Retrieving Information 2,000.00 2,000.00 2,000.00 <br />Automatic Rain Gauge and Protective Housing 500.00 500.00 500.00 <br />Data Logger for Rain Gauge 250.00 250.00 250.00 <br />Annual Maintenance 75.00 175.00 175.00 425.00 <br /> Subtotal 11,305.00 39,755.00 48,505.00 99,565.00 <br />Assumptions: <br />Number of Saprolite Wells: 8 to an avg. maximum depth of 60' 18 total <br />Number of Bedrock Wells: 10 total, using 9 existing bedrock wells. si25~o9 <br />Details: <br />Year 1: Use existing out-of-use bedrock wells to initiate data collection. Geophysical logging of existing <br />bedrock wells by DWQ may be necessary to ensure casing leakage is not occuring. <br />Year 2: DWR hosts collected data on their network server at no cost. <br />Years 3+: Recurring capital anticipated every 5 years to replace data loggers. $5,000 /year phased FY 2014-2016. <br />Other maintenance activities will include upkeep of well heads for security purposes, <br />replacement of broken or worn equipment, replacement of dessicant <br />rn <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.