Browse
Search
Agenda - 09-15-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 09-15-2009
>
Agenda - 09-15-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2009 10:00:58 AM
Creation date
9/11/2009 10:00:53 AM
Metadata
Fields
Template:
BOCC
Date
9/15/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
2009-076 ERCD - Orange Co and Preservation of the Eno River regarding Utilization of Former Water Supply Well
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
2009-077 ERCD-Orange Co and University of North Carolina at chapel Hill regarding Utilization of Former Water Supply Well
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
2009-078 ERCD-Orange Co and Duke University regarding Utilization of Former Water Supply Well
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20090915
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observation Well Network Timeline 5 ~ <br />August 2009 <br />• If the surface casing in an existing well is found to be leaking, repairs to <br />the well or not using the well are options which must be considered and <br />evaluated on a case-by-case basis. <br />• The security of each well head must be evaluated and possibly improved <br />prior to the use of each well. <br />5. Given the limited budget, internal resources should be used to complete as many <br />of the necessary tasks as possible to minimize expenditures. This could include: <br />a. Using County personnel to try to remove pumps from wells, to provide an <br />electrician to facilitate the use of existing pumps in wells; <br />b. Utilizing Environmental Health resources, including personnel, generator <br />and video camera system, to examine existing wells for casing integrity. <br />6. It should be a priority to complete the tasks listed in Item 4 above, to facilitate use <br />of the following County owned bedrock wells to permit data collection to begin: <br />• The Blackwood Farm well, (DONE) <br />• The Rocky Ridge Road well, and <br />• The Millhouse Road well. (DONE) <br />7. The EH video camera should be used to see if the surface casings on the <br />following wells are leaking, in the order listed: <br />• The Blackwood Farm well, (DONE) <br />• The Rocky Ridge Road well, <br />• The Millhouse Road well, and (DONE) <br />• Pumps must be pulled at the following properties: <br />• The Blackwood Farm, (DONE} <br />• The UNC- CH well, <br />• The former 911 center, <br />• The Duke Forest Well on Eubanks Road, and <br />• The Eno River Association well on Highland Farm Road. <br />• Inspection of other wells with the down-hole camera should occur once <br />MOAs are finalized for each of the following wells: <br />• The UNC CH well, <br />• The Duke Forest Well on Eubanks Road, and <br />• The Eno River Association well on Highland Farm Road. <br />Proposed Completion Date: October 31, 2009 <br />8. If it can not be conclusively determined if the casing of an existing well(s) is <br />leaking or not through inspection using the EH downhole video camera system, <br />
The URL can be used to link to this page
Your browser does not support the video tag.