Orange County NC Website
Observation Well Network Timeline 5 ~ <br />August 2009 <br />• If the surface casing in an existing well is found to be leaking, repairs to <br />the well or not using the well are options which must be considered and <br />evaluated on a case-by-case basis. <br />• The security of each well head must be evaluated and possibly improved <br />prior to the use of each well. <br />5. Given the limited budget, internal resources should be used to complete as many <br />of the necessary tasks as possible to minimize expenditures. This could include: <br />a. Using County personnel to try to remove pumps from wells, to provide an <br />electrician to facilitate the use of existing pumps in wells; <br />b. Utilizing Environmental Health resources, including personnel, generator <br />and video camera system, to examine existing wells for casing integrity. <br />6. It should be a priority to complete the tasks listed in Item 4 above, to facilitate use <br />of the following County owned bedrock wells to permit data collection to begin: <br />• The Blackwood Farm well, (DONE) <br />• The Rocky Ridge Road well, and <br />• The Millhouse Road well. (DONE) <br />7. The EH video camera should be used to see if the surface casings on the <br />following wells are leaking, in the order listed: <br />• The Blackwood Farm well, (DONE) <br />• The Rocky Ridge Road well, <br />• The Millhouse Road well, and (DONE) <br />• Pumps must be pulled at the following properties: <br />• The Blackwood Farm, (DONE} <br />• The UNC- CH well, <br />• The former 911 center, <br />• The Duke Forest Well on Eubanks Road, and <br />• The Eno River Association well on Highland Farm Road. <br />• Inspection of other wells with the down-hole camera should occur once <br />MOAs are finalized for each of the following wells: <br />• The UNC CH well, <br />• The Duke Forest Well on Eubanks Road, and <br />• The Eno River Association well on Highland Farm Road. <br />Proposed Completion Date: October 31, 2009 <br />8. If it can not be conclusively determined if the casing of an existing well(s) is <br />leaking or not through inspection using the EH downhole video camera system, <br />