Orange County NC Website
2 <br />Once the conference information is incorporated in the SPAP application, this abstract item will <br />permit the Manager to sign the application to pursue awards. <br />FINANCIAL IMPACT: The grants would total $1.4 million. Orange County has $.9 million <br />remaining in a CIP fund for Efland-Buckhorn sewer projects construction. $300,000 has been <br />spent on engineering design services for both projects. Therein Orange County has or will be <br />able to spend at this time $1.4 million which would meet the 45% matching STAG grant ratio. <br />The project has been estimated by the engineering consultant, Coulter, Jewel, Thames (CJT), <br />to cost between $4.3 and $4.7 million, so additional funding will be necessary unless the project <br />is scaled back with the approval of prior review agencies. <br />RECOMMENDATION(S): The Interim Manager recommends the Board: <br />1. Approve the submittal of an application, and <br />2. Authorize the Chair and Interim Manager to sign the application for submittal. <br />