Browse
Search
Agenda - 09-15-2009 - 3c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 09-15-2009
>
Agenda - 09-15-2009 - 3c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2009 9:24:04 AM
Creation date
9/11/2009 9:24:02 AM
Metadata
Fields
Template:
BOCC
Date
9/15/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
3c
Document Relationships
Minutes - 20090915
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 4 20 <br />Services And Facilities Objective PS-T-5: <br />Include in applied site design standards for residential, commercial, and industrial development, appropriate <br />road design standards to ensure adequate law enforcement and emergency vehicle access to the <br />develo ment <br />Res onsible Entit <br />a. Lead De artment: Plannin <br />b. Su ortin De artment s : Environment and Resource Conservation <br />Parks and Recreation <br />A in Oran a Public Trans ortation <br />Economic Develo ment <br />Adviso Boards <br />Oran e Unified Trans ortation Board <br />Plannin Board <br />Pur ose: <br />The CTP provides guidance for selecting projects to implement transportation goals/objectives (for selecting <br />ro~ects to be funded in the Trans ortation Im rovement Pro ram throu h various fundin mechanisms . <br />Im lementation Strate /Action Plan: <br />To develop along-range multi-modal plan to serve present and future travel demand in Orange County by <br />mapping existing facilities, facilities that need improvement, and recommended new facilities/alignments for <br />hi hwa s, ublic trans ortation and rail, bic cles, and edestrians. <br />Fiscal Im act: <br />The Comprehensive Transportation Plan will require planning staff resources and material costs for maps for <br />the ublic outreach meetin sand co ies of the CTP Surve . <br />'' Public Involvement Process: <br />The schedule proposes a public workshop the last week in September with a public comment period through <br />December. The CTP Committee and the Orange Unified Transportation Board (OUTBoard) will use the public <br />input and comment from the Planning Board, the Economic Development Commission, the Commission for the <br />Environment, and the Transportation Services Board to develop a draft CTP, which will be presented at a <br />second public workshop in February. The process calls for a public hearing in May 2010, with final BOCC <br />a royal in June 2010. <br />a. Timeline <br />b. `Notice to Proceed': ro osed for Se tember 15, 2009 <br />c. Ado tion: ro osed for June 2009 <br />Work Product: <br />Four (4) maps that show existing facilities, facilities that need improvement, and recommended new <br />facilities/alignments for: <br />1. Highways <br />2. Transit <br />3. Bicycle Facilities <br />4. Pedestrian Facilities. <br />Technical Re ort. <br />Re ortin /Monitorin /Evaluation: <br />Re orts in A ril and Ma for comment and direction; Final in June. <br />
The URL can be used to link to this page
Your browser does not support the video tag.