Browse
Search
ORD-2009-027 Resolution Amending the County Flood Damage Prevention Subdivision Zoning Atlas Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2009
>
ORD-2009-027 Resolution Amending the County Flood Damage Prevention Subdivision Zoning Atlas Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 4:06:52 PM
Creation date
9/4/2009 4:22:37 PM
Metadata
Fields
Template:
BOCC
Date
4/21/2009
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
5b
Document Relationships
Agenda - 04-21-2009 - 5b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 04-21-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />1 -42-92. Specific Standards <br />2 -42-93. Specific Standards — Approximate A Zones <br />3 -42-94. Subdivisions et al. <br />4 -42-95. Standards for areas of shallow flooding <br />5 -42-96. Effect on outstanding floodplain development permits <br />6 -Article Twenty-three (13) Enforcement will include section 42-70 of the FDPO <br />7 -Article Two (2) Board of County Commissioners and its Administrative Mechanisms is <br />8 being amended to include the Variance Procedures outlined Within Section 42-71 of the FDPO <br />9 -Article Six (6) Application of Dimensional Requirements is.being amended to include the <br />10 specific requirements for the proposed overlay district (includes Sections 42 -91 through 42-96 of <br />11 the FDPO) <br />12 <br />13 -42-97. Effect on rights and liabilities under existing FDPO <br />14 -42-98. Effective date <br />15 Article -four (24) <br />16 -Sections 42-97 through 42-98 of the FDPO, are being placed within A icle Twenty <br />17 Legal Status Provisions and Effective Date of the Zoning Ordinance <br />18 <br />19 Zoning Atlas — incorporation of Flood Map Data (map) <br />20 <br />21 Additional work being proposed - FIRM Map Amendments <br />22 Letters of Map Amendment (LOMA) — 5 <br />23 A localized amendment only to the FIRM, <br />24 *Letters of Map Revision (LOMR) — 4 <br />25 An'amendment to the FIS and FIRM, and <br />26 '*Summary of Map Action (SOMA) —1. <br />27 SOMA <br />28 LOMAs & LOMRs (maps) <br />29 <br />30 Frequently Asked Questions, <br />31 -Why did I receive a certified letter. and/or postcard informing me of the PUBLIC HEARING? <br />may be applicable to m property? <br />32 -Will this change and/or-impose new flood regulations. that Y. <br />33 -How long have the floodplain regulations been in effect? <br />34 -Who defines floodplain boundaries and h ' ow are they designated? <br />35 -What if I want to challenge the location my property within a floodplain? <br />36 <br />37 Staff recommendation: <br />38 1. Receive the proposed amendments, public comments on the proposed amendments, <br />39 2. Conduct the public hearing to receive p ommendation with a recommendation be <br />40 3. Refer the matter to the Planning Board for a rec scheduled for April 21, 2009 BOCC <br />41 submitted back to the BOCC in time for the agenda <br />42 meeting, and <br />43 .4. Adjourn the public hearing until i April 21, 2009 to receive the Planning Board <br />44 recommendation(s) and any submitted written comments. <br />45 <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.