Orange County NC Website
29 <br />j)_State and Federal regulations concerning floo-dWain development <br />See- 11.9.2 Duties and IrpeDonsibilities of the Flood lain Administrator. <br />or shall include but not be limited to: <br />Duties of the Flood lain Administrator 110L uy- <br />1. Review all flood lain development applications and issue Hermits <br />for all proposed development <br />that the re uiremenis of ; Ordinance have been'sati <br />2. Advise permittee that additional Federal or State Hermits (i.e. <br />Wetlands, Erosion and Sedimentatiion Control ' ari Suffers, <br />Minin etc. ma be re uired and if qneciflc Federal or State <br />permits are known, require that copies of such permits be <br />dRIa development <br />prgy - <br />:ided. and maintained. on file with the <br />p <br />3. Notify adjacent communities and the North Carolina Department <br />of Crime Control Public Safety Division of Emergency <br />Manageme_nt�State�Coo�rdi�mnator�tor _nIe INr pnor to MY <br />alteration or relocation of a watercourse, and submit evidence of <br />such notification to -FEMA. <br />4. Ensure that maintenance is provided �y!iffiin the altered or <br />relo purse so that We 11099:9MUMr;, <br />capacity is not diminished. <br />5. Prevent ftoodw ays and non - encroachment <br />But <br />areas unless the certification <br />and tIooCL hazard reduction-- <br />lio <br />3jsions comply with Section 6.32.3. <br />6 Obtain ac, to mean. sea level) of. the <br />reference level (including . <br />basement) of all attendant utilities of all <br />new oz substantially )ved structures according to Sectton <br />IL6131. <br />7 Obtain the actual elevation (in relation to mean sea level ) to <br />which the new or istantiall un roved structures and All <br />utilities have been igod Rr oofed to Section 14.6(3)-. <br />according - <br />8. relation to mean sea level) of all <br />public utilities according to Section 14.6(3 . <br />9. when flood proofin is utilized fora particular . structure, Obtain <br />certifications from a North Carolina licensed Professional <br />En ' eer oz Architect ding to Section 6.32.2. <br />10. Where inte relation is needed as to the exact -location of <br />boundaries of the SHIAL(Lor �exam*e, where -there appears to be <br />a conflict --between --a--M--aMed- bound ga and actual field <br />