Browse
Search
ORD-2009-029 - Amending Zoning Ordinance-Time Limit of Start Construction of Planned Development
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2009
>
ORD-2009-029 - Amending Zoning Ordinance-Time Limit of Start Construction of Planned Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 10:33:46 AM
Creation date
9/4/2009 3:59:06 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2009
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
C1
Document Relationships
Agenda - 05-18-2009 - C1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 05-18-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Only one (1) extension request shall be granted on an single PD <br />project. In the event construction has not commenced within the <br />allotted timeline, the PD shall, become null and void as detailed <br />herein. <br />2. Master Planed Development: In instances where an applicant is <br />proposing large -scale, multiple individual land uses on a giv en <br />parcel of 12LopgM through an approved Master Plan construction <br />shall commence, and proceed at a reasonable rate within twelve <br />(12) months from the date the permit is approved by the County <br />Board of Commissioners. <br />The applicant may receive an extension from the Zoning Officer <br />extending the timeline for the commencement of construction <br />activities for up to fortei hg t (48) months if the applicant can <br />provide evidence indicating that: <br />a. The applicant has, in good faith, pursued in a timely <br />manner any and all permits associated with the <br />commencement of construction activities for the project <br />b. That the need for the request is based on an agencies <br />review /processing of a permit application and <br />c. That the request is not the result of the inability of the <br />applicant to submit the required permit applications and <br />that the need for the extension results from factors beyond <br />the applicants control. <br />Only one (1) extension request shall be granted on an r single PD <br />project. In the event construction has not commenced within the <br />allotted timeline, the PD shall become null and void as detailed <br />herein. <br />It should be noted that no extension request shall be approved if such <br />request represents an alteration No- changes —shall be -ode to the <br />conditions of approval for a Planned Development prole-+. A m=r^-•�' of <br />,;ft that pergs -have been pursued in a - I 1 <br />delays have resulted &em faeters beyond the eentFol ef the developen <br />
The URL can be used to link to this page
Your browser does not support the video tag.