Browse
Search
ORD-2009-029 - Amending Zoning Ordinance-Time Limit of Start Construction of Planned Development
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2009
>
ORD-2009-029 - Amending Zoning Ordinance-Time Limit of Start Construction of Planned Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 10:33:46 AM
Creation date
9/4/2009 3:59:06 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2009
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
C1
Document Relationships
Agenda - 05-18-2009 - C1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 05-18-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Commencement of Construction: In instances where an <br />applicant is proposing the development of a single land use on <br />a specific parcel of property, construction shall commence and <br />proceed at a reasonable rate within twelve (12) months from <br />the date the permit is approved by the County Board of <br />Commissioners. <br />For the purposes of this section, a Single -Use Development <br />shall mean a project proposing a single, specific, use of a given <br />parcel of property or a project involving the development of <br />multiple structures with a similar use such as a residential <br />subdivision or a non - residential office park approved through <br />the submission of a site - specific development plan in <br />accordance with the provisions of this Article. <br />b. Extension: The applicant may receive a six (6) month <br />extension, extending the timeline for the commencement of <br />construction activities in accordance with the provisions of this <br />Section. <br />If an extension is granted, the total timeline allotted for the <br />commencement of construction for a Single -use Development <br />shall be eighteen (18) months from the date of approval of the <br />project by the County. <br />c. Limits on Extensions: Only one (1) six (6) month extension <br />shall be granted for any Single -use Development Project. <br />2. Master Planned Development: <br />a. Commencement of Construction: In instances where an <br />applicant is proposing a project with multiple, individual, land <br />uses on a given parcel of property through the review and <br />approval of a Master Plan application, as detailed within this <br />Article, construction shall commence and proceed at a <br />reasonable rate within twelve (12) months from the date the <br />permit is approved by the County Board of Commissioners. <br />b. Extension: The applicant may receive a maximum forty -eight <br />(48) month extension, extending the timeline for the <br />commencement of construction activities in accordance with <br />the provisions of this Section. <br />With respect to Master Planned Development projects, the total <br />allowable extension granted by the County shall be the <br />minimum amount of time necessary to obtain any and all <br />identified permits, as determined by the applicant and staff, and <br />may not necessarily be the maximum forty -eight (48) month <br />timeline. <br />
The URL can be used to link to this page
Your browser does not support the video tag.