Browse
Search
ORD-2009-015-Proposed Amendments toArticle 2 Sections 2.2.14.3 through 2.2.14.9 of the Zoning Ordinance Clarifying the Procedures and Requirements for Amendments to the Adopted comprehensive Plan- 04-21-2009-5a
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2009
>
ORD-2009-015-Proposed Amendments toArticle 2 Sections 2.2.14.3 through 2.2.14.9 of the Zoning Ordinance Clarifying the Procedures and Requirements for Amendments to the Adopted comprehensive Plan- 04-21-2009-5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2009 12:53:23 PM
Creation date
9/3/2009 12:39:42 PM
Metadata
Fields
Template:
BOCC
Date
4/21/2009
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
5a
Document Relationships
Minutes - 20090223
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />b) The expansion of a designated plan area where the additional area <br />is contiguous to the existing plan designation and does not increase <br />its land area by more than one hundred (100) acres; <br />c) A correction of an error or omission; or <br />d) Revisions to any factual or descriptive material. <br />*2.2.14.3 Consideration of Amendments <br />*Amended <br />8!3!82 , <br />9rse: <br />Principal amendments shall generally only be considered once each year <br />at the quarterly public hearing in February; provided, however, if a <br />principal amendment is scheduled by the Board of Commissioners for <br />other than the February public hearing, it shall be scheduled during one of <br />the quarterly public hearings held in May, August, and November. <br />Secondary amendments may be considered four (4) times each yeast <br />the quarterly joint public hearings in February, May, August, and <br />November. <br />~Je A County initiated ~repesed amendment +s-te may be considered in <br />conjunction with a rezoning, <br />request for the same property. For amendments initiated by any person or <br />agency (non-County), requests for a rezoning, planned development <br />and/or special use permit may only be considered at subsequent hearings <br />or meetings following approval of the proposed amendment to the <br />Comprehensive Plan. <br />2 2 14 4 Application for Amendment to Adopted Comprehensive Plan <br />All applications for amendments to the Comprehensive Plan shall be in <br />writing_and signed Three copies shall be filed with the Planning Director. <br />Before accepting any amendment application, the Planning Director shall <br />ensure that it contains all reauired information, as specified in this <br />ordinance Applications which are not complete, or otherwise do not <br />comely with the provisions of this ordinance, shall not be accepted by the <br />Planning Director but shall be returned to the applicant, with a notation by <br />the Planning Director of the deficiencies in the application. <br />Contents of Application <br />Applications for amendments_to the Comprehensive Plan, without limitin <br />the right to file additional material shall contain at least the following: <br />a) For amendments to the Land Use Plan (map) within the Land Use <br />Element a fully dimensioned map adequately illustrating the land <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.