Browse
Search
Agenda - 09-01-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 09-01-2009
>
Agenda - 09-01-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 12:36:46 PM
Creation date
8/28/2009 4:23:12 PM
Metadata
Fields
Template:
BOCC
Date
9/1/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20090901
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
RES-2009-065 Reimbursement Resolution - Solid Waste Transfer Station Project
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAL OWEN & ASSOCIATES, INC. <br />It is strongly recommended that. the delineated wetlands and streams be verified by the <br />US Army Corps of Engineers. A Corps- approved Jurisdictional Determination would be <br />initiated by preparing and submitting a package coning a map of the delineated wetlands and <br />streams, processed copies of the wetland and stream data forms that were previously collected at <br />the site and ether supporting documents and maps. we will be happy to support the County as <br />you proceed with this process. A. site visit by a Corps representative- will likely be required to <br />review the delineation work. <br />A wetland reconnaissance investigation was conducted for the remaining portion of the <br />site. The property boundaries were walked and several traverses were conducted across the <br />interior of the subject site. Areas that appear to rneet , the criteria for jurisdictional wetlands or <br />streams were observed and are appro imately located on the attached neap. <br />it is encouraged that you use care and good judgment when working in or around wetland <br />areas. Currefit environmental regulations require a permit far any activity that impacts wetlands, <br />which include filling, draining, and mechanized land clearing of the wetland. area: A permit <br />application prior to construction typically must be submitted to both the Corps of Engineers and <br />the Division of Water Quality if it is anticipated that wetland impacts will occur. The applicant <br />i <br />is � re uired to shag that all measures have been taken to � 0 Is and avoid wetland.. impacts. <br />r • r w ■ r • • <br />Uh.avoid6ble wetland impacts require niffigation and may include the creation of new wetlands, <br />preservation. of existing wetlands, payment into a wetland fund, or some combination.. <br />Additional information about regulatory requirements and permitting can lie provided at your <br />request. <br />Endangered Species Investigation <br />Plant and animal species, with federal or state classifications of endangered or threatened <br />status and occurring in the .vicinity of the subject site were identified.. As of 31 January 20 .08, the <br />United States Fish and Wildlife Service listed four endangered species in, Orange County, NC <br />(see attached). However, none of these species is shown as occurring within, the white Cross <br />Quadrangle by the North Carolina Natural. Heritage Programs ('C NB P). As of 9 January 2009, <br />the NC NHP does list three species with state classifications of endangered or threatened status <br />as occurring in Orange County and the white Crass Quadrangle. These species are the Brook <br />Floater Alasmido eta varicose)(federal species of concern, state endangered species), the Yellow <br />Lampmussel (Lampsills cariosa)(federal species of concern, state endangere.d species), and the <br />Creeper Mussel (Strophitus undulatus)(no federal, status, state threatened species). <br />These three animals are lotic species (stream dwellers) and require specific stream <br />.characteristics for their survival. Based on our, investigation, it appears that the streams at this <br />site have potential to support only the Creeper Mussel. The Creeper Mussel distribution range <br />includes the Cane Creek subbasm* in Orange County; and its habitat preference ranges from <br />headwater streams to large rivers and lakes, and substrates ranging from rsilt to gravel (see <br />attached description). <br />Soil Science Investigations * wetland Delineations, Permitting, and Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.