Browse
Search
Agenda - 09-01-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 09-01-2009
>
Agenda - 09-01-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 12:36:46 PM
Creation date
8/28/2009 4:23:12 PM
Metadata
Fields
Template:
BOCC
Date
9/1/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20090901
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
RES-2009-065 Reimbursement Resolution - Solid Waste Transfer Station Project
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page <br />IL Comments on EA Sectionsm. <br />3.0 Existing Environmental Characteristics of Project Area <br />3.J Nome Levels <br />Reference to the American Stone Quarry is misleading. While there are <br />trucks that enter and exit the shone quarry. 3.5 miles east of the project <br />area, almost all trucks leaving the quarry burn east on Highway 54 toward <br />Chapel Hill rather than west toward Site 056,, according to company <br />employees. There is lithe or no noise or related truck traffic at the project <br />area from the quarry and tucks located 3.5 miles east. <br />3.10 Water Resources <br />3.10.1 Groundwater Resources <br />Groundwater recharge in the project area, rather than in the vicinity needs <br />to be examined closely, <br />4.0 predicted Environmental Effects of the Project <br />4.1 Topography <br />'i l w n 1! I l effect" cited r"th no numerical or comparative data. <br />4.3 Land Use <br />According to county Planning staff., the "exclusive planning jurisdiction' <br />ffi <br />means that the county may build a government facility anywhere in Orange <br />County regardless of zoning and without rezoning. Staffing that there are no <br />conflicts with zoning does not address the proposed industrial facility's <br />inconsistency with current land use and the property's zoning, which is <br />agricultural residential. <br />4.4 Wetlands <br />Several areas of wetlands are identified in the SVVID in Appendix A, one of <br />which drains into the stream located along the proposed access road, and <br />these areas merit further investigation before any determination is made as <br />to impact. <br />Comments- Orange County Transfer Station Site 056 Environmental Assessment <br />Laura t eft fell, Preserve Rural Orange <br />
The URL can be used to link to this page
Your browser does not support the video tag.