Browse
Search
Agenda - 09-01-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 09-01-2009
>
Agenda - 09-01-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 12:36:46 PM
Creation date
8/28/2009 4:23:12 PM
Metadata
Fields
Template:
BOCC
Date
9/1/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20090901
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
RES-2009-065 Reimbursement Resolution - Solid Waste Transfer Station Project
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division of Environmental. Health Raleigh <br />Regional Office* <br />Michael Douglas <br />North Carolina Wildlife- Resources <br />Commission <br />Piedmont Region Coordinator Habitat <br />Conservation Program <br />— Shari L. Bryant <br />Department of Transportation <br />Clearinghouse Coordinator <br />— Ms. Shirley Foye <br />NC Crime Control & Public Safety — <br />Division of Environmental Management — <br />Floodplain Mapping Program <br />Clearinghouse Coordinator <br />Mr. Rodger W. -Durham <br />North Carolina Department of Cultural <br />Resources State Historic Preservation <br />Office — Renee Gledhill — Earley for Peter <br />Sandbeck — Administrator <br />of the site.' <br />............... <br />Depending on number of employees the <br />project could be a NTNC system and require <br />PWSS approval. <br />Okay with proposal and provides two <br />recommendations to further minimize impacts <br />to aquatic and terrestrial wildlife resources. <br />A site specific survey of wetlands and <br />streams within the project boundaries <br />should be performed prior to site <br />design and construction if one has 'not <br />already been done. If wetlands and/or <br />streams are found, the project should <br />be coordinated with the U.S. Army <br />Corps of Engineers - and the N.C. <br />Division of Water Quality. Site design <br />and construction should avoid <br />impacting these resources to the <br />maximum extent practicable. <br />Maintain a minimum 100 foot <br />undisturbed, native, forested buffer <br />along perennial streams [each. side], <br />and a 50 foot buffer along intermittent <br />streams and wetlands [each side]. <br />No comment <br />No comment <br />Recommend comprehensive survey by an <br />experienced archaeologist. <br />
The URL can be used to link to this page
Your browser does not support the video tag.