Orange County NC Website
The Town of Chapel Hill's interest is, "To support the environmental sustainability of our <br /> community by actively pursuing the goal of 61% waste reduction and by reducing our carbon <br /> footprint by 50% by 2020. <br /> Criteria that could impact our operation are: <br /> - An increase in non-productive route time, driving to and from the route to the <br /> disposal site is a major consideration. We have conducted time and distance studies <br /> from the geographic center of Chapel Hill to distances of 10, 12, 15 and 20 miles <br /> away. These studies included Highway 54 West, 1-40 West and Highway 86 North. <br /> Beyond the 12-mile point, which adds 38 to 40 minutes round trip drive time <br /> depending on location, we would need to add another crew with equipment to <br /> continue the same level of service we currently provide. <br /> - An equipment change to a dual axle residential fleet. Currently, only two trucks are <br /> dual axle. Three more will be delivered to the Town due to the normal fleet <br /> replacement cycle this fall. That will leave fire rear loaders to be changed out at cost <br /> of approximately $700,000. <br /> - Fuel cost will increase if the site is other than the current site. The amount of <br /> increase would vary depending on the distance and time of travel. <br /> As an example of the impact of changing to a more remote hauling site, a time and <br /> distance study was conducted from various Chapel Hill locations to the Durham Transfer Station <br /> (DTS). <br /> Southern Village center to DTS. Miles: 20.3 Time: 28 minutes <br /> Meadowmont center to DTS. Miles: 17.6 Time: 26 minutes <br /> Parkside Neighborhood to DTS. Miles: 17.4 Time: 22 minutes <br /> Downtown Chapel Hill to DTS. Miles: 17.1 Time: 27 minutes <br /> DTS to Town Operations Center Miles: 20.6 Time: 27 minutes <br /> This would increase our travel time during the day to 1 hour. Transfer station wait time <br /> could approach 15 minutes. The additional time per route would compromise our ability to <br /> complete routes within a work day with additional resources. <br /> We would need to add 1 crew, with equipment to sustain our current task system. <br /> 1 Equipment Operator !! Salary and Benefits $43,800 <br /> 2 Collectors Salary and Benefits $74,000 <br /> Total personnel costs $117,800 <br /> Additional rear-loader, fuel and maintenance $200,000 <br /> TOTAL $317,800 <br /> Fuel Projections: <br /> Estimated data on increased annual fuel cost from the DTS to the TOC for residential <br /> trucks only would increase $28,900 dollars. <br /> 14,996 miles (14 routes x 52 weeks x 20.6 miles) divided by 1.6 miles per gallon <br /> average rear loader multiplied by $3.08 which was the average 3rd quarter fuel cost for this FY. <br /> Estimated data on increased annual fuel cost only by all routes to DTS would increase <br /> $76,100. <br />