Browse
Search
Agenda - 08-24-2009 - E1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 08-24-2009
>
Agenda - 08-24-2009 - E1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 12:15:30 PM
Creation date
8/19/2009 11:34:21 AM
Metadata
Fields
Template:
BOCC
Date
8/24/2009
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
E1
Document Relationships
Minutes - 20090824
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Attachment 1 <br />1.5.2. PLAN REVIEW AND EVALUATION <br />The following Plan review and evaluation procedures should be <br />conducted according to the timelines given: <br />1. A set of evaluation criteria, including a set of sustainability <br />and community building indicators, or metrics, together with <br />specific action statements will be developed for each Plan <br />Element by each Element Advisory Board with assistance of <br />County staff within the first year after plan adoption. The <br />evaluation criteria may include short -term (1 -2 years), <br />medium -term (3 -5 years), and long -term (more than 5 years) <br />measurements. Combined, these evaluation criteria will be <br />used to inform periodic updates of the Plan. The evaluation <br />criteria will serve as a "Report Card" and will describe how <br />and where the County is making progress on implementation <br />of the plan and where additional attention may be needed. <br />2. Comprehensive Plan Element Status reports to the Board of <br />County Commissioners will be developed by respective <br />Advisory Boards and staff. Status reports will include a <br />review and evaluation of Plan goals and objectives using the <br />evaluation criteria discussed above. The report will be <br />developed every other year beginning one year after adoption <br />of the Plan and will be delivered to the Board for review at its <br />annual retreat. A specific format for reporting will be <br />developed to maintain consistency in reporting. <br />3. The County Profile Element will be updated after data from <br />the 2010 U.S. Census are available. Regular updates to the <br />County Profile Element should occur to reflect new U.S. <br />Census data in subsequent years. <br />4. Following the incorporation of 2010 data, a survey of County <br />departments will be undertaken by the Planning and <br />Inspections Department to determine the usefulness of the <br />County Profile Element, and if annual updates would be <br />beneficial. <br />5. A full review and update of the Comprehensive Plan will <br />occur within 10 years of adoption of the plan, with a <br />preliminary target of 2015. <br />
The URL can be used to link to this page
Your browser does not support the video tag.