Browse
Search
Minutes - 20071207
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2000's
>
2007
>
Minutes - 20071207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2009 4:23:59 PM
Creation date
8/13/2009 4:21:32 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2007
Meeting Type
Work Session
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Solid Waste Director Gayle Wilson introduced Jeff Crate, Vice President, of Draper Aden <br />Associates. <br />Jeff Crate said that Orange County is already a client of Draper Aden and they want <br />Orange County to succeed in the siting project. He reviewed part of the Interview Manual, as <br />follows: <br />Draper Aden Associates -What You Get <br />Over 30 years of solid waste management experience <br />- We practice a specialty in serving all aspects of the Solid Waste Management field <br />- Over 60 individuals in our program, in the following disciplines: <br />o Planning and Design <br />o Environmental Services <br />o Geotechnical and Construction Services <br />Our experience includes: <br />- Transfer Station Design and Permitting <br />o North Carolina Experience <br />- Work with Orange County's Solid Waste Management Program <br />- Siting of Solid Waste Facilities applying siting criteria County-wide <br />- Extensive work in the public arena, with BOCCs, CACs, local groups, media <br />- Conducting due diligence on prospective Solid Waste Facilities, including existing facilities <br />and greenfields <br />As amulti-disciplined firm, we also provide: <br />- 225-person firm <br />- Comprehensive Environmental Services <br />- Groundwater Monitoring, water quality assessments <br />- Wetlands delineation, Stream assessments and mitigation <br />- Site Planning and Engineering <br />- Utilities, Geotechnical, Structural, and Traffic Engineering <br />Objectivity: <br />DraperAden Associates' Mission Statement: <br />We exist to help our clients succeed. To do this, we will: <br />- Understand our clients' business <br />- Provide full range of quality services <br />- Make best use of our clients' resources <br />- Use appropriate technology <br />- Be there when our clients need us <br />- Have a great work environment <br />He made reference to the Project Experience -Solid Waste Facility Siting information in <br />their packet, and said that, out of the entire list, including convenience centers, Draper Aden has <br />done 40 different siting projects. When it comes to landfill facilities, using the criteria that <br />Orange County has discussed so far, they have sited about 8-9 of them. <br />Lynn Klappich, Team Leader/Project Manager, said that she knows that this process will <br />take time, challenge communications, and challenge timelines and it is a hard process. She <br />said that the most challenging projects for her are the siting projects since they become <br />emotional very quickly. She said that there must be communication from the beginning. She <br />said that the process that Draper Aden uses does find sites, though. The more objective and <br />
The URL can be used to link to this page
Your browser does not support the video tag.