Orange County NC Website
Special Provision <br />~ . A copy of the executed encroachment agreement and the approved puns stamped by NCDC?T <br />will be on the site and available for ins ection b NCDDT ersonnel while in construction is <br />aka e~ss. ~f safety or traffic conditions warrant such an action, NCDDT reserves the right <br />to stop all work unless evidence of approval can be shown. <br />2, It will be necessary for you or your contractor to notify Mr. DeAngela Tones, Assistant <br />District Engineer upon receipt of this letter to schedule a mandatory Preconstruction <br />Conference, to provide your anticipated date of starting or to review any plan revisions made <br />by the District Office prior to construction beginning on this encroachment. Mr. hones can be <br />reached at ~33d} 5706833 between the hours of 5.00 a.m. and 5:00 p.m. Monday through <br />Friday. <br />3. When the wank has been completed, please notify Mr. Zones by letter at P.D. Bax 7d6, <br />Graham, North Carolina 27253-076b in order that a final inspection can be made. <br />4. The North Carolina Department of Transportation is in the process of developing a Wark <br />Zone Traffic Control Qualification & Training program that will begin its implementation in <br />2009. This pragram will require qualified and trained Work Zone Flaggers in every flagging <br />operation ~~uly 2009}, qualified and trained Work Zone Traffic Control Installers on~ every <br />traffic control installation ~,lanuary 2010 and qualified and trained Work Zone Traffic <br />Control Supervisors an Significant Projects July 2010). It is intended far the pragram to <br />include anyone working within NCDDT Right of Way including work associated with <br />NCDDT construction and encroachment agreements as well as all NCDDT operations, <br />Training for this certification will be provided by NCDDT approved training sources andlor <br />private entities that have been pre..approved to train themselves. Additional information will <br />be provided as this program progresses. If you have questions, visit our web site at <br />www.ncdot.or l~wztc, or contact Meredith NlcDiarrnid with NCDDT Work Zone Traffic <br />Control Unit at X919} 250-4159 or nuncdiarmid @dot.state.nc.us. <br />5. That the party of the second part agrees to provide traffic control devices, lane closures, road <br />closures, positive protection andlar any other warning or positive protection devices <br />necessary for the safety of road users during construction and any subsequent maintenance. <br />This shall be performed in conformance with the latest NCDDT Roadwa Standard Drawin s <br />and Standard S ecifications far Road and Structures and Amendments or Supplements <br />thereto. When there is no guidance provided in Roadway Standard Drawings or <br />Specifications, comply with the Manual on Uniform. Traffic Control Devices for Streets and <br />H~hwa~s and Amendment or Supplement thereto. Information as to the above rules and <br />regulations rr~ay be obtained from the Division Engineer of the party of the first part, <br />6. work requiring Zane closure or restrictions will not be allowed between 7:OO am _ 9:Uo <br />am and 4:OO p.m. -~ 7:0o p.m. Monday through Friday unless otherwise directed by the <br />district Engineer unless otherwise shown on approved plans. <br />7. At least on lane of traffic shall remain open at all times. <br />8. Any wank requiring equipment or personnel within 5' of the edge of any travel lane shall <br />require a lane closure with appropriate tapers. <br />P,~~ Box 7fi5, Graham, NC 27253 <br />