Browse
Search
Agenda - 12-15-1998 - 10b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 12-15-1998
>
Agenda - 12-15-1998 - 10b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 3:38:07 PM
Creation date
8/7/2009 3:05:00 PM
Metadata
Fields
Template:
BOCC
Date
12/15/1998
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
10b
Document Relationships
Minutes - 19981215
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTHERN COMMUNITY PARK PROJECT <br />The project was begun in 1990 when the site was purchased. The park is located off <br />Airport Road and Homestead Road and encompasses almost exactly 40 acres. <br />Council approved an initial conceptual plan in 1993. Council approved a site plan in <br />1994. <br />Funding has come from a variety of sources: Town 1989 park bond funds, Town 1996 <br />park bond funds, County 1997 park bond funds, and Capital Improvement Project funds. <br />The project, as is currently approved and funded, is $4,578,000. This includes $250,00 in <br />design and engineering; $35,000 in land purchase (beyond initial purchase); and <br />approximately $30,000 in OWASA tap fees. The site has been very grading intensive. <br />The basic infrastructure of the park should be completed by the end of 1998. At that <br />point, the park will contain an outdoor basketball court and a picnic area ready to use. <br />Two 300' softball fields and 2 full size soccer fields —all lighted and irrigated —have <br />been developed and should be ready for use in the fall, 1999. The turf has not been <br />determined —still considering sodding or seeding. All roads, paths, utilities, etc. have <br />been installed for the park. The concession/shelter by the skateboard facility should be <br />completed by the end of 1998. <br />What's left to do? <br />Skateboard Facility: <br />The main slab has been poured. A Skateboard Design Committee (comprised of <br />community youth and adult skateboarders and staff) has been working with a planner to <br />develop a site plan. There is a budget for $60,000. Staff expects the facility construction <br />to be completed by spring, 1999. <br />Playground: <br />The playground facility has been put out to bid. The bids will be opened December 15, <br />1998. A committee of citizens has been formed to review proposals. $60,000 is <br />budgeted for the project. Staff anticipates construction during the winter /spring, 1999 to <br />be completed by late spring /early summer, 1999. <br />Batting Cage Facility: <br />At its September 28, 1998 Council adopted allocated $200,000 in Town park bonds all <br />for development of batting cage project. Staff is currently working with the architectural <br />firm that designed the park to develop a conceptual plan for the batting cage. The next <br />step will be engineering drawings then the Town will go out on bid for construction. At <br />the current schedule, staff anticipates the batting facility to be ready for public use in <br />early fall, 1999. <br />Aquatic Facility /Community Center: <br />At its September 28, 1998 Council appropriated $53,000 from FY98 -99 budget for <br />conceptual plan process of aquatic facility /community center. Staff anticipates <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.