Orange County NC Website
~2z <br />This school year, the system is serving 148 people in the Mentally Retarded <br />Program, which include 18 trainable mentally retarded, 109 speech and langu- <br />age impairment, 330 with learning disabilities, 285 gifted and talented, <br />and 30 listed as emotionally disturbed. Three new teaching positions are <br />planned for this program, while 60 percent of funding for these positions <br />comes from the State, 40 percent will be expected from local funds. One <br />position is anticipated to direct the special needs program. <br />The second program, the Provision of Additional Aides. Under this <br />proposal, the part-time aide position would become full-time and the <br />individuals would work as classroom aides, between the morning and after- <br />noon monitoring duties. Funds provided in this proposal would convert <br />some 8 to 10 of the 36 monitor positions to full-time monitor/aide positions. <br />Dr. Hanes continued to review with the Board the various programs and <br />improvements anticipated for 1977-78. <br />He stated that it was anticipated that a fund balance might be pre- <br />sent at the end of this school year of $163,000. Eighty-eight thousand <br />of this is unappropriated fund balance from the previous years and the <br />remaining some $75,000 is unextended funds from the current year's budget. <br />Dr. Hanes stated that the grand total of projected teaching positions <br />in the proposed budget is 360.7 positions. 6.5 positions are from the <br />current school year, 266.1 positions are State allotments, 10 positions <br />are Federal allotments, and 84.5 teaching positions are .paid by local funds. <br />The system employees in its administrative staff 29 people. The <br />Maintenance Staff is composed of 9 people. <br />Chairman Whitted asked Dr. Hanes to comment on the types of testing <br />done throughout the year. <br />Dr. Hanes stated that the system was in the fourth year of a <br />Standarized Testing Program where the tests are administered at the <br />third, sixth, ninth, and eleventh grades. The Towa Test for basic skills <br />is used. <br />Further discussion ensued regarding the program, Special Needs of <br />Exeptional Children. Dr. Hanes stated that the School System was not <br />reaching the target population of emotionally disturbed people. The <br />proposed budget identifies the creation of a third trainable mentally <br />retardation class. The system presently has classes for. the primary <br />grade to the junior high school grades, but there is a gap for .ages 9 <br />through 13, and this third class is a proposal to cover the child with <br />special needs from the time he comes to school until he is old enough to <br />enter the Sheltered Workshop Program. <br />Dr. Hanes reviewed with the Board the Capital Outlay Budget for 1977- <br />1978. He stated that this proposed budget totals $425,960, which is an <br />increase of $34,96D over the 1976-77 outlay budget of $391,000. This <br />budget reflects no new major construction projects but is a continuation <br />of those types of capital expenditures needed each year in an on-going <br />school system. The proposed expenditures are separated into four categories, <br />Category T, Acquisition of Real Property, and Construction Enlargements, ar <br />Renovations of Buildings. Category 22, Acquisition yr Replacement of <br />Furnishings and Equipment. Category TI2, Acquisition of School Buses, <br />Activity Buses and other motor vehicles, and I~, Contingency. <br />Dr. Hanes pointed out to the Board, Category 2, Project 2, which is <br />the construction of a new guidance offices in former art roams areas at <br />the Chapel Hill Senior High School at a cost of $19,000 and the modifica- <br />tion of Science Rooms to create one .additional Science Lab at a cost of <br />$16,000. These modifications became necessary because of relocating <br />other classrooms in the Cultural Arts Building. <br />Dr. Hanes was asked how the bond referendum monies would be spent <br />and he stated that $480,000 would be used for construction of a warehouse <br />at Lincoln Center, $200,000 will be used toward construction of an athletic <br />field at Phillips High, $200,000 to be used for construction of an athletic <br />field at Culbreth Junior High, $75,000 is proposed for a bus parking area <br />at Seawell Elementary School. The remodeling of schools at Carrboro, the <br />Estes Hills Elementary School and the Glenwood Elementary School totals <br />about 3/4 of a million dollars. $19fi,000 of the bond monies will be used <br />for a Multi-purpose Center at Phillips High School, $200,000 is to be used <br />for a Multi-purpose Center at Frank Porter Graham, $400,000 has been used <br />for the Cultural Arts Building, $175,000 is to be used to bring Lincoln <br />