Browse
Search
2009-004 Solid Waste - UNC - Landfill Gas Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-004 Solid Waste - UNC - Landfill Gas Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:42:53 AM
Creation date
7/29/2009 12:27:50 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4l
Document Relationships
Agenda - 02-17-2009 - 4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 02-17-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A and Meter Point B with a design accuracy of not less than two percent (2%) for all parameters <br />measured and taking into account vel-ification methodologies for Enviroinnental Benefits. <br />134. Such Gas Flow Meters shall be owned, operated, maintained and calibrated by the <br />University at its sole cost and expense. The Gas Flow Meters shall be designed and operated to <br />provide time-synchronized data for MMBtu and to provide all other information required to be <br />measured pursuant to this Agreement. The University's Gas Flow Meters shall be sealed, with <br />t11e seals broken only for the purpose of inspecting, testing, repairing, or recalibrating the <br />metering devices. The University shall keep its Gas Flow Meters accurate and in good working <br />order and the University shall periodically test such metering equipment as the University deems <br />necessary; provided that the University shall test its metering equipment at least once every six <br />(6) months, but in no case less than any testing requirement set forth in any applicable Laws or <br />manufacturers' recommendations. In the event a Gas Flow Meters is to be tested, cleaned, <br />repaired or recalibrated, or otherwise read or inspected by the University, the University shall <br />provide the County with five (5) days prior written notice of any such procedure, so that the <br />County may be present during any such procedure. The University shall preserve all charts, test <br />data and similar records in accordance with the record retention provisions of Para~aph 148 of <br />this Agreement. The County shall have the right to install and maintain its own Gas Flow <br />Meters. <br />135. The County and its agents shall have the right from time to time, at reasonable <br />times during the Tei7n, to monitor, access, and inspect the condition and use of the LFG Project <br />and to monitor, access, and inspect work in progress and the day-to-day operation of the LFG <br />Project. Any such monitoring, examinations, inspections or visits shall be conducted in a <br />mam~er so as to cause minimum interference with the University's LFG Project. <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.