Browse
Search
2009-004 Solid Waste - UNC - Landfill Gas Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-004 Solid Waste - UNC - Landfill Gas Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:42:53 AM
Creation date
7/29/2009 12:27:50 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4l
Document Relationships
Agenda - 02-17-2009 - 4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 02-17-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
System enacted under federal legislation in the United States, or in the absence of such a system, <br />must be eligible carbon offsets under the Califol-~iia Climate Action Registry, the Voluntary <br />Carbon Standard, or the rules of any regional compliance market, such as the Regional <br />Greenhouse Gas Initiative or the Westel-~7 Climate Initiative. <br />F. Billin <br />127. The University shall cause the metering devices to be read on the last day of each <br />month during the Tel-~n of this Agreement..The University shall thereafter prepare and deliver to <br />the County on or before the fifteenth (15th) day of each subsequent month the Flare Pa}nnent <br />and/or the Conversion Payment along with a statement to the County (a "Monthly Billing <br />Statement") providing all relevant metering infoi-~nation and data that will clearly indicate (and <br />will pei7nit the. County to verify) the. (i) quantity of Landfill Gas on an SCF basis delivered to the <br />Meter Points A and B during the preceding calendar month; (ii) the Meter Point A Methane <br />Content and the Meter Point B Methane Content; (iii) the Flare MMBTU HHV and the <br />Conversion MMBTU HHV; (iv) the Flare Payment and the Conversion Payment; (v) any <br />adjustments made under Subpart E of this Article VII; and (vi) reasonably detailed calculations <br />perfoi7ned by the University to derive all of the foregoing information. <br />ARTICLE VIII <br />RESPECTIVE EFFECTIVE DATES OF TI3E UNIVERSITY'S OBLIGATIONS UNDER THIS <br />AGREEMENT <br />128. Construction Date - (Construction of LFG Collection System). The <br />University shall have no obligation to commence construction of the LFG Collection System (or <br />to continue construction of the LFG Collection System if construction has already commenced) <br />prior to the University's receipt of all LFG Project Pei7nits relating to such system. Within ten <br />(10) days of its receipt of the last Approval necessary to construct the LFG Collection System, <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.