Browse
Search
2009-004 Solid Waste - UNC - Landfill Gas Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-004 Solid Waste - UNC - Landfill Gas Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:42:53 AM
Creation date
7/29/2009 12:27:50 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4l
Document Relationships
Agenda - 02-17-2009 - 4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 02-17-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
best efforts to design the LFG Collection System to minimize any incremental increase in the <br />County's costs of Landfill closure incurred to accommmodate the LFG Collection System. The <br />University shall share equally (50%-50%) with the County the incremental increase in the <br />County's costs of Landfill closure incurred to accommodate the LFG Collection System; <br />provided, however, that the University shall not be obligated to pay, nor be responsible for, any <br />costs and expenses in excess of $50,000. <br />65. The University shall, at its own expense; prepare, maintain, and submit to the <br />County monthly reports on Landfill Gas production rates, which shall include an accounting of <br />all LFG and the methane content of such LFG delivered to Meter Points A and B. <br />66. Notwithstanding anything contained in this Agreement to the contrary, the <br />University aclc~iowledges that Landfill operations take precedence over the LFG Project, and, at <br />all times .during the tei-~n of the Agreement, and subject to its teens, the County shall have the <br />right to operate the Landfill, and to take all actions at its own cost and expense that the County <br />deems necessary or appropriate in coiu~ection with the operation and maintenance of the <br />Landfill, including actions to comply with the Landfill Permits and any applicable Laws. The <br />University further aclalowledges and agrees that the primary use of the Landfill is as a sanitary <br />landfill, and that the LFG shall be limited to production from the Landfill. <br />67. The University shall develop and implement a health and safety plan no less <br />stringent than that of the County with regard to the University's operations at the Landfill and <br />any work perfoi-~ned by its elmployees, contractors, or agents at the Landfill. <br />68. The County shall allow the University to dispose at the Landfill, or at a <br />wastewater treatment plant used for the Landfill's leachate, any Waste Materials generated by <br />the LFG Project, provided such disposal is allowed under the Landfill and LFG Project Pel-~nits <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.