Browse
Search
2009-004 Solid Waste - UNC - Landfill Gas Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-004 Solid Waste - UNC - Landfill Gas Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:42:53 AM
Creation date
7/29/2009 12:27:50 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4l
Document Relationships
Agenda - 02-17-2009 - 4l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 02-17-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fifteen (15) calendar days to complete the final review and approval of such revised plans and <br />specifications prepared by the University. Any revised plans and specifications for which the <br />County has not provided a response within fifteen (15) calendar days shall be deemed approved. <br />Should subsequent changes or modifications be made to the-plans and specifications after they <br />have been approved, the County shall then leave seven (7) calendar days to review and approve <br />such changes or modifications. Any subsequently revised plans and specifications for which the <br />County has not provided a response within seven (7) calendar days s11a11 be deemed approved. <br />Within a reasonable time after completing construction of the LFG Collection System, but no <br />longer than sixty (60) calendar days, the University shall provide to the County all "as-built" <br />plans and specifications for the LFG Collection System. Until the "as-built" plans and <br />specifications for the LFG Collection System are provided to the County, the University shall <br />keep the County informed as to the state of the construction of the LFG Collection System and <br />the location of all then-installed components of such system. <br />64. The University, its employees, agents and subcontractors shall minimize <br />disruption to Landfill operations during construction, operation, and maintenance of the LFG <br />Project. During the Tern of this Agreement, the University, its employees, agents and <br />subcontractors shall not ulueasonably interfere with the County's operation of the ~.,andfill, <br />including, but not limited to, the County's closure of portions of the Landfill and any other <br />requirements under the Landfill Permits or applicable Laws, and shall reasonably ensure that the <br />Landfill is not damaged by the University. Should such damage occui, the University shall <br />arrange for the repairs itself; provided, however, that the County has the right to take iimnediate <br />action to effectuate whatever repairs are necessary to the Landfill and. the University shall timely <br />reimburse the County for the reasonable costs of any such repairs. The University shall use its <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.