Browse
Search
Agenda - 01-19-1999 - 9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 01-19-1999
>
Agenda - 01-19-1999 - 9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2009 4:39:03 PM
Creation date
7/17/2009 4:39:03 PM
Metadata
Fields
Template:
BOCC
Date
1/19/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 19990119
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Attachment 1 <br />Major Duties <br />Engineering Associate Position <br />1. Efland Sewer System <br />a. Oversee the operation of the Efland sewer system. <br />(1) Review invoices for treatment costs, billing expenses and maintenance costs. <br />(2) Evaluate waste treatment and power costs to determine trends in total waste flows <br />to detect storm water infiltration or other unusual and unsatisfactory conditions. <br />(3) Coordinate with property owners/customers, contractors, NCDOT and other <br />utility owners as necessary to install service taps to existing sewer lines. <br />(4) Investigate customer complaints to determine the nature and source of problems, <br />and responsibility for effecting remedial actions and repairs. Follow through to <br />effectively respond. <br />b. Support the Efland sewer expansion. <br />(1) Provide technical and administrative assistance with the workload related to <br />upcoming short- and long-term projects and initiatives related to expansion of the <br />Efland sewer system. <br />(2) Participate in consultant selection and development of design contract <br />(3) Develop draft project scope for BOCC approval. <br />(4) Identify and implement construction and operation financing strategies. <br />(5) Identify permanent and construction easements. <br />(6) Coordinate easement acquisition process. <br />(7) Coordinate construction grant application and permitting process. <br />(8) Oversee project construction activities. <br />(9)Administer construction contract and close-out process. <br />(10) Set up revised/expanded maintenance and billing operations. <br />2. Eno River Use <br />a. Oversee the operational provisions of the Eno River Capacity Use Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.