Browse
Search
Agenda - 01-19-1999 - 8j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 01-19-1999
>
Agenda - 01-19-1999 - 8j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2015 10:58:21 AM
Creation date
7/17/2009 4:16:17 PM
Metadata
Fields
Template:
BOCC
Date
1/19/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8j
Document Relationships
Minutes - 19990119
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />and lines of pipe as shall be necessary for the proper construction and operation of said <br />water distribution system; OWASA shall also have the right of ingress and regress <br />through, over, and across the land of the COUNTY to and from said strip at such times <br />as OWASA deems it necessary for the purpose of constructing, maintaining and <br />inspecting said lines and of making all necessary alterations and repairs thereto; the <br />lines of pipe shall be located at such point or points, elevation or elevations below or <br />above the surface of the earth as shall be necessary, for proper operation of the system, <br />and shall be established at the proper grade for running said lines and for conveying <br />water as aforesaid; and OWASA shall have the right, privilege and easement to tap the <br />line or lines and construct water laterals from the main to the outside boundary of the <br />right -of -way over which this easement and privilege extends; and, OWASA shall have <br />the privilege, easement, and right to clear and keep cleared the full width of the <br />easement of and from brush, plants, trees, and any and all other materials, obstructions, <br />structures, and encroachments of any kind; <br />The County shall retain the right to cultivate the ground lying within the <br />boundaries of the easement, provided that such cultivation shall not interfere with the <br />right of OWASA herein named of ingress and egress to said easement for the purpose <br />of maintenance and repair of said water main or mains or the construction and repair of <br />water laterals and connections, and such cultivation shall not interfere with OWASA's <br />maintenance operation or installation of the lines, -and provided further that in all cases <br />where there are roads or streets across the tract of land sufficient for the purpose of <br />convenient egress, ingress, and regress, in, to, and from said strip of land, such roads <br />or streets shall be used by the said OWASA when it is necessary to come in and upon <br />said strip of land for the purposes aforesaid. <br />No building or structure of any kind, except such as constructed by OWASA, shall <br />be located or erected upon the above described easement; which said structure as <br />constructed by OWASA shall be approved by County prior to its being built; <br />
The URL can be used to link to this page
Your browser does not support the video tag.